Creating an Order and Assigning it to the Project 
Use
You create the order with reference to the RFQ and assign it to the top element of your work breakdown structure.
Generally, you would enter multiple document items, for example, to correspond with the components of the power plant. In this example, however, you create only two items:
The Vessel item is created as a component of the power plant that is to be billed separately.
The Power plant item is created to summarize all of the other items contained in the order. We do this for simplification reasons.
This type of splitting the order into items, the type of billing, the prices, and so on, were agreed with the customer during the contract negotiations on the basis of the quotation.
Prerequisites
In Customizing for Sales and Distribution we have maintained the following data:
We have stored the following materials in the material master:
Procedure
Menu Path |
Logistics ® Sales and Distribution ® Sales ® Order ® Create |
Transaction Code |
VA01 |
Field |
Data |
Order Type |
ZEC3 (IECPP: Order) |
Field |
Data |
Quotation |
The document number of the quotation you noted for the simulation version |

You can search for the document number of your quotation using WBS element A-20###.
Field |
Data |
PO number |
A-20### |
Material |
Quantity |
IECPP-1-PP01 |
1 |
IECPP-1-VE01 |
1 |
.Process document items
Field |
Data |
WBS element |
A-20### |
Field |
Data |
Rate (Item 10) |
300.000.000 |
Field |
Data |
WBS element |
A-20### |
Field |
Data |
Rate (Item 20) |
30.000.000 |