Cycle Modification Factor 

You can use the cycle modification factor to define the execution time for a maintenance plan individually. To do this, modify the cycle for the maintenance strategy which is generally valid to meet the requirements of the technical system, process or location.

By entering a cycle modification factor, you can lengthen or shorten the cycle specified in the maintenance strategy. A cycle modification factor greater than 1 lengthens the cycle, whereas a factor less than 1 shortens the cycle.

A maintenance strategy with a total cycle duration of 60 days is assigned to the maintenance plan. You want to change that for this plan. Therefore, you enter the cycle modification factor 1.5.

Cycle according to strategy

60 days

Cycle modification factor

1.5

Result

60 x 1.5 => 90 days