Controls whether a pipeline withdrawal is allowed when the requirement cannot completely be covered by other stocks (according to the item table).
The quantity withdrawn from the pipeline material is treated as a partial quantity according to the split criterion.
The optional pipeline withdrawal is not supported by the following applications:kanban, and thepull list.
Pipeline withdrawals are not supported for material to be handled in batches either.