In-Period / For-Period / In-Period View / For-Period View 

In-Period

The in-period (start and end date of a period) is the payroll period in which a payroll result is generated.

For-Period

The for-period (start and end date of a period) is the payroll period for which a payroll result is generated.

In-Period View

An in-period view is a selection of payroll results from the payroll directory (for example, RPCLSTRD Payroll Result for Germany) for a number of in-periods. The payroll results that were generated for the required number of payroll periods in the selected period are selected.

For-Period View

A for-period view is a selection of payroll results from the payroll directory (for example, RPCLSTRC Payroll Result for Switzerland) for a number of for-periods. The payroll results that were generated in the required number of payroll periods for the selected period are selected.

Example: For-Period View / In-Period View

Payroll
result

For-period
view

Start date
for-per.view

End date
for-per.view

In-period
view

End date
in-per.view

1

01/1997

01.01.1997.

31.01.1997

02/1997

28.02.1997

2

02/1997

01.02.1997

28.02.1997

02/1997

28.02.1997

Explanation

The payroll result 1 for the payroll period (for-period) 01/1997 has the start date 01.01.1997 and the end date 31.01.1997. This payroll result was generated in the payroll period (in-period) 02/1997.