Displaying a Standard Network 

Use

Standard networks are assigned to the standard project. When creating the operational project, the standard network is used as a template for the operational network that is created with the project. It contains internal and external processing, as well as primary costs, however it does not contain materials.

In the course of the project, materials are copied from the WBS BOM to the network and assigned to individual activities by using the BOM-PS interface. For the assignment, reference points to each activity have already been maintained in the standard network.

You can find further information in the SAP Library under

Logistics ® Project System (PS) ® Structures ® Standard Structures ® Standard Networks

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    From the node Templates, choose Standard network ® Display

    Transaction Code

    CN03

  3. Enter the following data:
  4. Field

    Data

    Standard network

    T-20000

  5. Choose .
  6. You see an overview of the activities. The internal and external processing, and primary costs are maintained on different tab pages.

  7. To view the reference points for the assignment of materials over the BOM-PS interface, select the Total tab page.
  8. If you want to display the individual activities and their relationship to each other, choose .