If you are in the graphic mode and notice that certain objects are not yet contained as linked objects, you can add those nodes directly in the graphic.
Prerequisites
The system requirements for graphic display must be fulfilled at your workstation.
For more information about the graphic, see BC - SAP Graphics: User’s Guide.
Procedure
The system now creates a graphic containing all required object links in the object network.
An empty node field appears in the navigation area.
The system automatically copies the data of the other node to the initial screen for the link. You only need to add the second functional location or the second piece of equipment in the link master record.
There you can see the link and node identifications.