The analytical app displays the Key Performance Indicator (KPI) Open Reservations for Project
. You can display details of all open reservations in a project. This is used to compare the quantity of materials withdrawn versus the requested quantity.
Enables you to drill-down to specific project, WBS element, and network activity details of the open reservation.
Displays the partial project hierarchy structure from the selected material component up to the project definition.
The number of open reservations is calculated using the required and withdrawn quantity of the material.
There are charts that are used to identify the stock availability in the current project and across projects, plants and sales orders.
You can group the open reservations based on the project it belongs to or a range of days due or overdue.
You can filter the open reservations based on any of the following:
Project
Material
Range of days due or overdue
You can navigate to related fact sheets.
Integration with the SAP Jam collaboration platform.
The underlying query view reuses the MaterialComponent
reuse view. This enables the display of the long material number on your app.
The app offers the possibility to directly access other apps.
Note
These linked apps have to be already available in your system landscape or you have to implement them along with this app.
Project
fact sheet
WBS Element
fact sheet
Network
fact sheet
The app consists of front-end components and back-end components. The back-end components and the front-end components are delivered in separate products and have to be installed in a system landscape that is enabled for SAP Fiori.
SAP Smart Business Product | SAP Smart Business 1.0 for SAP ERP SPS 6 |
---|---|
Contains Virtual Data Model (VDM) | SAP HANA Live 1.0 for SAP ERP SPS 10 |
SAP Business Suite Product | SAP enhancement package 7 for SAP ERP 6.0 SPS 7 |
For more information about the system landscape to run SAP Smart Business cockpits, see Installation.
PS-FIO