Configuration Settings: Missing Parts for Project
This document contains configuration information for the Missing Parts for Project
app.
For information on how to configure SAP Jam, see http://help.sap.com/sapjam
.
Before you can use this app, you need to configure it using the SAP Smart Business Modeler.
Note
To configure the app, please make copies of the KPI, evaluations, and drill-down configurations provided by SAP, and make your changes in these copies. Also, create your own tiles.
Please do not change the original versions provided by SAP, since new support packages and releases would overwrite your changes.
The KPI has been preconfigured as follows.
KPI ID: sap.hba.ecc.ps.ProjectMissingParts
KPI Description: Displays number of material components that are missing across projects
Goal Type: Minimizing
Parameter | Value |
|---|---|
SAP HANA View | - |
OData Service | /sap/hba/r/ecc/odata/ps/kpi.xsodata |
Entity Set | ProjectMissingPartsQueryResults |
Value Measure | NumberOfMissingMatlComp |
Semantic Object/Action | MaterialComponent/processProjMissingPart |
The following templates for evaluations, drill-downs, and tiles are provided.
Evaluation ID: sap.hba.ecc.ps.ProjectMissingParts.ProjectMissingParts
Parameter | Value |
|---|---|
OData Service | /sap/hba/r/ecc/odata/ps/kpi.xsodata |
Entity Set | ProjectMissingPartsQueryResults |
Value Measure | NumberOfMissingMatlComp |
Semantic Object/Action | MaterialComponent/processProjMissingPart |
Scaling Factor | Auto |
This table shows some example values.
Parameter | Value |
|---|---|
Value Type | Fixed Value |
The following tables show the input parameters, filters, and some preconfigured example values. Use your own values where required, according to the data in your backend system.
Filters
Filter | Operator | Value | Explanation |
|---|---|---|---|
Project | Between | H00002 to H00004 | Choose the project for which you would like to view the project parts that are missing. |
SAPClient | Equal to | 004 | Enter the SAP client you use corresponding to the SAP ERP system |
View ID: sap.hba.ecc.ps.ProjectMissingParts.ProjectMissingParts.sap.hba.ecc.ps.ProjectMissingParts_Project Missing Parts_1
View Title: Project Missing Parts
Limit Data Records: 200
Parameter | Value |
|---|---|
Dimensions |
|
KPI Measure | Number Of Missing Material Component |
Bar
Single Axis
Absolute Values
Default Colors
Title (KPI): Project Missing Parts
Subtitle (Evaluation): across Projects
Parameter | Value |
|---|---|
Tile Format | Numeric Tile |
Navigation | Other Drill-Down |
Semantic Object | MaterialComponent |
Action | processProjMissingPart |
For information on evaluations, drill-downs, and tiles, see SAP Smart Business on SAP Help Portal:
For SAP NetWeaver 7.31:
For SAP NetWeaver 7.4: