Starting with the initial delivery date, the app is delivered with each support package stack of the respective SAP Fiori product. This document only lists support package stacks in which the app has been enhanced or changed. If the app was not changed in a particular support package stack, then this support package stack is not mentioned in this document.
The Monitor Production Orders or Process Orders app has been enhanced as follows:
SAP Fiori for SAP ERP 1.0 SPS 8 (Delivery Date 10/2015)
New/Enhanced Key Features |
New key features:
|
New Navigation Targets |
Linked apps:
Linked fact sheets:
|
New/Enhanced Extensibility Options |
New extensibility options:
|
SAP Note for Technical Changes |
Release Information Note for SAP Fiori Apps for Material Requirements Planning (1955289 ) |
SAP Fiori for SAP ERP 1.0 SPS 5 (Delivery Date 01/2015)
New/Enhanced Key Features |
New key features:
|
New/Enhanced Extensibility Options |
No changes |
SAP Note for Technical Changes |
Release Information Note for SAP Fiori Apps for Material Requirements Planning (1955289 ) |
SAP Fiori for SAP ERP 1.0 SPS 3 (Delivery Date 07/2014)
Initial delivery.