Show TOC

App History: Monitor Capacity UtilizationLocate this document in the navigation structure

App history for SAP Fiori app.

Note

Starting with the initial delivery date, the app is delivered with each support package stack of the respective SAP Fiori product. This document only lists support package stacks in which the app has been enhanced or changed. If the app was not changed in a particular support package stack, then this support package stack is not mentioned in this document.

SAP ERP Production Planning and Detailed Scheduling Add-On 1.0 SPS 1 (UIPPDS01 100) (Delivery Date 01/2016)

Initial delivery.