Show TOC

App History: Project Material ComponentLocate this document in the navigation structure

Use
Note

Starting with the initial delivery date, the app is delivered with each support package stack of the respective SAP Fiori product. This document only lists support package stacks in which the app has been enhanced or changed. If the app was not changed in a particular support package stack, then this support package stack is not mentioned in this document.

The Project Material Component fact sheet has been enhanced as follows:

SAP Fiori for SAP ERP 1.0 SPS 5 (Delivery Date 01/2015)

New/Enhanced Key Features

New:

SAP Fiori for SAP ERP 1.0 SPS 3 (Delivery Date 07/2014)

New/Enhanced Key Facts

New:

  • The fields Purchase Requisition, Procurement Type, and Planned Independent Requirement have been included to the fact sheet.

SAP Fiori for SAP ERP 1.0 SPS 2 (Delivery Date 05/2014)

Initial delivery.