Use this function if you have posted goods issue by accident or find that there is a problem with the shipment (for example, goods are damaged while on the shipping dock).
If the system has already created the documents for the next cross-docking location, you must first cancel these documents.
Note
To minimize the number of cases where you need to cancel subsequent documents, you can schedule output processing to run a periodic job shortly before the documents are physically required at the next warehouse. To do this, you attach an output timing program to the output type in Customizing (IMG path:
.When you choose to cancel a goods issue in your EWM system:
The EWM system calls BAPI_OUTB_DELIVERY_CHANGE, which checks the ERP system to determine whether goods issue cancellation is permitted.
The ERP system calls BAdI /SPE/GI_CANCEL, which checks the status of the subsequent pair of cross-docking documents.
If goods issue cancellation is allowed, the ERP system:
Reverses the goods movement documents
Resets the distribution status and goods issue status
Deletes the output that would have triggered the creation of the next delivery document pair