In assembly processing you need to link the material, to be used in the sales document item for, and the standard network
If you do not create this link, a dialog box appears when you create the sales document, in which you are asked to enter the standard network.
Choose
and then .A list of the existing links appears.
Choose
.An entry screen appears.
Enter the material number, order type, standard network, and a profile for the network to be created.
You specify the network type (order type) itself in the requirements class. Here you specify for which network types the link is valid. If you enter *, the standard network is valid for all network types.
You can also enter:
A standard WBS element as a default for the sales document account assignment.
A network profile for the new network
An MRP controller for the new network.
You can either enter the MRP controller directly or specify where the system should take the information from, the network profile (1) or the material master (2).
How external relationships to other standard networks in the same sales order are handled. You can
Manually select the relationships to copy to the network
Copy no external relationships
Copy all external relationships
Copy the external relationships to networks in the same main sales order item
Save your entries.