Show TOC

 Installing Further Sub-Equipment

  1. Select an equipment master screen, using Start of the navigation path Structure Next navigation step Sub-equipment End of the navigation path .

  2. In the screen Installation Location: Equipment Overview , choose Start of the navigation path Edit Next navigation step Install equipment End of the navigation path .

  3. The list entry screen Installation Location: Install Equipment is displayed.

  4. Enter further pieces of sub-equipment.

  5. Choose Start of the navigation path Edit Next navigation step Equipment overview End of the navigation path to return to the screen Installation Location: Equipment Overview .

  6. Save the equipment master record.