Show TOC

Creating Process Chains for a Semantically Partitioned ObjectLocate this document in the navigation structure

Context

The process chains are not part of the semantically partitioned object but the wizard still helps you to create the process chains.

Procedure

  1. In the wizard, choose Create Process Chain The screen is now divided into three areas: The left screen area contains an overview of your DTPs. The upper right area shows the process chains that have been generated and in the lower right area, you can create your process chains in the detailed view.
  2. In the overview, select the DTPs that you want to run together in a process chain. Choose Add in the detailed view.
  3. The system suggests a path and a sequence, which you can change if necessary. If you assign several DTPs to a path, the DTPs are executed in the specified sequence. If you select a separate path for each DTP, these DTPs are executed at the same time.
  4. Save and generate the process chain. If you choose Generate, you create a start process.
  5. Select a scheduling option and choose Create.
  6. Save your entries and choose Back. Your process chains are now displayed in the Generated Process Chains screen area. In the process chain maintenance screen (transaction RSPC), these process chains appear under the node Created by semantically partitioned object.
  7. To execute the process chains, you need to open the process chain maintenance screen. To do this, choose Process Chain Maintenance in the detailed view.
  8. Choose Schedule. The process chain is executed according to your settings.