Reactions to the Availability
Check
If you create a sales order in the OLTP system and carry out the availability check in SAP Advanced Planning and Optimization (SAP APO), you branch to a delivery proposal screen. If you simulate an availability check in SAP APO, the Confirmation screen appears. The following functions and displays are available:
The system checks here if the requested delivery date can be met.If stock for the desired product exists on the requested delivery date, the system proposes the stock quantity. If stock does not exist, a zero appears as the confirmed quantity.
To accept this solution, choose
with
the quick info text One-time delivery/confirmation.
The system checks here if enough stock exists for a full delivery on any later date. If enough stock does exist to cover a request from the sales document on a later date, the system proposes the date here. If a full delivery is not possible on any later date, the system displays no proposal.
In an availability check in which the checking horizon is taken into account, the system proposes the date on which the checking period expired, if the stock did not cover the incoming orders quantity before the end of the checking horizon.
In an availability check in which the checking horizon is not taken into account, the system is only oriented towards stock and planned receipts.
To copy this solution to the sales
document, choose
(Full
delivery/confirmation).
The system checks here if, and on which dates, partial deliveries are possible. The system proposes partial deliveries on different dates based on the planned receipts and issues on the time axis.

In comparison to the functionality in the ERP system, the delivery proposal function in SAP APO has been enhanced considerably. In addition to the date, the time is also shown. You can deactivate this setting using the SET/GET parameter /SAPAPO/DISP_NO_TIME. You can confirm a delivery proposal in every row. If you choose the delivery proposal in the last row, you confirm all delivery proposals. If you choose the delivery proposal somewhere else, the subsequent delivery proposals are not automatically confirmed.
In an availability check in which the checking horizon is taken into account, the system proposes the date that lies beyond the end of the checking horizon, if the stock cannot cover any partial deliveries before the end of the checking horizon.
In an availability check in which the checking horizon is not taken into account, the system proposes dates on which partial deliveries are possible based on existing stock.
To accept this solution, choose
with
the quick info text Delivery/confirmation proposal.
You can make the following changes manually on the delivery proposal screen: You can shift the date and the time in the Schedule line date of availability check - partial delivery field into the future and/or reduce the confirmed quantity. If you increase the confirmed quantity on the delivery proposal screen or shift the date of the partial delivery into the past, the system issues an error message. In this case, you can only leave the delivery proposal screen if you reenter at least the original confirmed quantity or shift the date into the future.

If you have
made changes on the delivery proposal screen, you must confirm these
changes by selecting a symbol (for example,
).
Otherwise, the changes are not copied into the sales order. This procedure is
necessary so that the system can recognize if dates or quantities have been
changed.
The system gives a warning in the form of a pushbutton if, for example, a date shift occurs during the combination of check methods (product availability check as the first check method, check against product allocations as the second).
If you are using the check against product allocations, it is possible that the product allocation that caused the confirmation is no longer valid. The availability check returns the late confirmation but also gives a warning. The warning is given irrespective of whether the confirmation date lies outside the validity of a product allocation.
If you receive such a warning on the Confirmation screen and/or on the delivery proposal screen, you should check the detailed results of the individual check methods.
You can branch to the Results and Log Display for Transportation and Shipment Scheduling. For more information, see the system documentation for the display.
If a multilevel ATP check has been carried out and the system has established that components are not available or only partly available, with the result that delays can occur with regard to the requested delivery date, you can branch to a missing parts list (via pushbutton). The components involved are displayed there. If necessary, you can display the characteristics that have lead to the relevant source determination, and as a result of which there is a delay.
In this view, you see the procurement
proposals that have not been deleted within
Recreation of Receipt
Elements during a new ATP check for sales order creation or change, since
a deletion was not permitted. You receive information on why the order could
not be deleted (for example, order fixed at header level).
You can branch to the planning log. There
is information on the most important situations and the resulting system
decisions during the multilevel scheduling of planned orders in CTP. One of
the situations that occurred could be, for example, that component XY does not
exist, component AB is delayed, or there is a scheduling error. One of the
possible system decisions would be, for example, to delete the order that
needs XY, to shift it into the future, or to determine an alternative source
of supply. For more information, see
Evaluations.
Pushbuttons are also given dynamically that you can choose to branch to the detail displays for the organizational levels, check types, and for the result in the multilevel ATP check. For more information, see the system documentation for these detail displays.
Pushbutton |
Description of the System Activity When You Choose this Pushbutton |
|
Returns to the initial screen without confirming |
|
Confirms a one-time delivery for the requested date |
|
Confirms a complete delivery |
|
Confirms a delivery proposal |
|
Displays the rule in
|
|
Performs a condition analysis. Condition types and other information about accessing condition records is displayed. Details about the condition type are displayed here. |
|
Displays the settings in the check instructions. |
|
Displays the stock, receipts, and requirements that were taken into account in the product availability check |
|
Branches to the product availability overview |
|
Displays the product allocation result in the case of a check against product allocations |
|
Displays the result in the case of a forecast |
|
Displays the requirements
profile. If you want to display the check instructions, choose |
Rounding |
Displays the rounding results. |
|
Displays the items that are to lose their confirmation to the advantage of the existing ATP results during reassignment of order confirmations (ROC). |