Start of Content Area

Query Quotation Controlling: Plan/Actual Comparison (Review)  Locate the document in its SAP Library structure

Technical name: 0UCC_MC01_Q0001

Use

You can use this query to compare quotation plan figures (in particular planned contribution margins) and actual (billed) values for commercial and industrial customers. It compares the data from the InfoCube for quotation planning (0UCCRMC07 based on 0UCCRMC05) with the (actual) sales (0UCCRMC01) and cost statistics (0UCCRMC03).

Note: When InfoCube 0UCCRMC07 is filled with data from 0UCCRMC05, the contract key is supplemented.

Filters

When you call the query, only certain data records are selected from the data basis.

InfoObject

Description of the InfoObject (and Restriction or Calculation Formula)

0UCCRMCONTR__0BP_RESPPER

You can restrict the selection to certain employees responsible (variable).

0UCCRMCONTR__0BP_EMPLO

In addition or as an alternative, you can apply a restriction for the contracts of a specific employee responsible (variable).

0UCCRMCONTR

Data records without a CRM contract number (utility contract (CRM)) are not displayed (only data records with 0UCCRMCONTR <> „#“ are taken into account).

Note: The selections/filters with a gray background do not require any user input (no variables) and are independent from the selection made by the user.

Free Characteristics

InfoObject

Description

0BPARTNER

The free characteristic for the navigation is the business partner.

Variables Used

When calling the query, the user has a number of input options:

Variable

Description

0I_CALYE

You can enter an interval of calendar years.

0P_BPRCT

If required, you can restrict the quotation plan data and actual data that you want to compare to the contracts of a specific employee responsible (optional). This takes place by means of the filter for characteristic 0BP_RESPPER, which is described above.

0P_BPECT

In addition or as an alternative, you can apply a restriction for the contracts of a specific employee responsible (variable). The selection takes place by means of the filter defined for characteristic 0BP_EMPL.

Rows

Two different structures are available for the characteristics in the rows (0UCC_MC01_QT_KYF1 and 0UCC_MC01_QT_KYF2).

InfoObject

Description of the InfoObject (and Restriction or Calculation Formula)

Structure 0UCC_MC01_QT_KYF1 (All key figures)

0UCWRK_AMT

Amount: Energy

0UCWRK_QNT

Quantity: Energy

0UCDEM_AMT

Amount: Demand

0UCDEM_QNT

Quantity: Demand

0UCRENTCHRG

Amount: Rental price

0UCFLATRATE

Flat-rate amount

0UCMISC_AMT

Amount: Other

0UCNET_AMT

The total amount is the sum of the energy, demand, rental price, flat-rate, and other amounts. It is the basis for determining the contribution margin 1.

0UCGRDUSAGE

Grid usage costs

0UCPROCUMNT

Energy procurement costs

0UCBILLCOST

Billing costs

0UCTRADCOST

Processing costs

0SALES_CS

Sales costs

Structure 0UCC_MC01_QT_KYF2 (contribution margins)

0UCWRK_AMT

Amount: Energy

0UCDEM_AMT

Amount: Demand

0UCRENTCHRG

Amount: Rental price

0UCFLATRATE

Flat-rate amount

0UCMISC_AMT

Amount: Other

0UCNET_AMT

The total amount is the sum of the energy, demand, rental price, flat-rate and other amounts.

0UCGRDUSAGE

Grid usage costs

Formula: Contribution margin 1

The contribution margin 1 corresponds to the business definition for the energy industry, namely: Revenue (= total amount) – grid usage costs.

0UCPROCUMNT

Energy procurement costs

Formula: Contribution margin 2

The contribution margin 2 is determined from contribution margin 1 less the energy procurement costs.

0UCBILLCOST

Billing costs

0UCTRADCOST

Processing costs

Formula: Contribution margin 3

The contribution margin 3 is determined from the difference between contribution margin 2 and the billing and processing costs.

0SALES_CS

Sales costs

Formula: Contribution margin 4

The contribution margin 4 is determined from the difference between contribution margin 3 and the sales costs.

Columns

The quotation plan values and actual billing values are placed in comparison in the columns – for each calendar month entered previously. The absolute deviation and the relative deviation are determined from the quotation plan data and actual billing data for each calendar month.

You use structure 0UCC_MC01_QT_KYF3 to differentiate between plan data and actual data and to calculate the absolute and relative deviation between them.

InfoObject

Description of the InfoObject (and Restriction or Calculation Formula)

0CALYEAR

Calendar year

0CALMONTH2

Calendar month

Structure 0UCC_MC01_QT_KYF3 (Plan/actual/difference)

Plan

Data records for which the plan version is not initial (0UC_VERS <> „#“) are selected here, that is, the plan data (as opposed to the actual data).

Actual

Data records, for which the plan version is initial, (0UC_VERS = „#“) are selected here, that is, the actual data (as opposed to the plan data).

Difference

The absolute deviation between plan and actual values (plan – actual) for the key figures in the rows.

% Variance

The relative deviation between plan and actual values ((plan – actual)/plan*100) for the key figures in the rows.

.

 

End of Content Area