The Quality
view provides detailed information about the quality of your custom code objects in the quality cockpit.
You display the results of ABAP Test Cockpit (ATC) runs and the open exemptions created for the results over a certain period of time. In your managed systems, you schedule ATC runs as background jobs.
On your managed systems, an ATC administrator has configured ATC runs by creating run series and run variants (transactions SCI
and ATC
).
Note
For more information about working with the ABAP Test Cockpit (ATC), see SAP Help Portal at http://help.sap.com and choose then under
Custom Application Development (ABAP)
choose
You have connected the BW system as part of SAP Solution Manager configuration.
You have activated the extractors for ATC results and ATC exemptions in the Custom Code Management scenario of SAP Solution Manager Configuration.
To display ATC Monitoring, you have the display role assigned. You are not able to validate and reject open exemptions.
To validate and reject open exemptions in ATC Monitoring, the following prerequisites apply:
The administrator role is assigned to your user (authorization object SM_ATC_APP
).
In the connected managed systems, your user exists with the same name.
Proceed as follows:
In the quality cockpit choose Create New
.
The system opens an embedded view to enter selection values for your new project.
New Project
screen area.
Provide the following details about your projects:
Project Name
Description
Project Owner
Custom Classification Variants
Predefined as default.
You can overwrite the ATC classification by defining that a specific check is an error instead of a warning or information. To do so, choose the Edit
button and enter the ATC Error Class
and ATC Error Code
that you want to change and enter the Custom Classification
.
Custom Time Estimation Variant
Predefined as default
You can overwrite the default time estimation that is needed to solve an error of one of the checks. To do so, choose Edit
and enter the estimated time in the Default Time Estimation (for unassigned errors)
field. The default time is 0.2 hours which you can change by entering a different value in hours.
Target Thresholds for Critical Errors
Example
Enter 100,00, if you aim to solve 100% of the errors.
Target Thresholds for Default Errors to be Improved
Check the Object Quality Levels
Select the Error
, Warning
and/or Information
checkboxes.
Object Selection
screen area
Select at the Package
containing the objects that you want to use for your quality project.
Optional: Object Type
, Application
, Project Owner
System Selection
screen area
Enter a Quality System ID
.
ChooseSelect the ATC variant for the quality system
and make the necessary entries.
Analysis Schedule
screen area
Define a Start Date
, Start Time
and Frequency
to determine when the ATC results are retrieved for the analysis of your quality project.
Choose Save Project
to confirm your entries.
All objects of the quality projects will be shown in the chart. This provides a quick overview of the overall status of your quality projects. The chart distinguishes between object status Critical
(status red), To Be Improved
(status yellow) and Information
objects (status green).
You have the possibility to filter the overview of the objects.
You can choose the following radio buttons:
Quality
Provides an overview of the total number of objects in all quality levels that is the different statuses.
Time Estimate
Provides a quick overview of the estimated time that is needed to perform necessary corrections.
You can display results of the quality projects in more depth. Proceed as follows:
In the Quality Cockpit
choose View List
to view the object results for all Active Projects
, Projects with Critical Objects
or Projects with Objects to be Improved
.
Select the desired project from the Project List
table.
You can display additional information to view more details about the analysis project and its analysis criteria or the objects with an error, warning or information.
Analysis History
This area lists the completed analysis runs and shows a graphical representation of the analyis results in terms of quality or time effort for the selected project.
Object Statistics
You can also statistical data about the objects, for example the number of ATC errors and warnings or the estimated time it will take to improve the object quality.
Object Selection
The Object List screen area lists all objects of the different quality levels individually.
You can use selection options to filter specific objects with an error or warning to view more details about it, for example when and who modified the object for the last time.