You can run a report about problem messages created, and monitor their status. You can, for example, cover the following use scenarios:
● Analysis of all problem messages with the status Open
● Analysis of problem messages created by a specified user, e.g. yourself
● Check the processing status of all messages with priority Very High
The data which you created in the configuration phase in the Problem Messages tab, is analyzed.
Selection Criteria |
Meaning |
Project structure |
Selection of substructures or structure elements to be analyzed |
Project Team Members |
Specify one or more project team member |
Object attributes ● message ● Description ● Status ● Priority ● ● Subject ● Creator ● Processor ● Created at ● Changed at |
● Message number ● Message short text
● Message priority, from Low to High ● Component - Message category |
Project structure with existing selection criteria values
● You can go directly to the problem message processing by double-clicking on a row in the results list (not a structure element).
● You can go directly to the Problem Message tab of a structure element in the configuration phase project structure, by double-clicking on the structure element.