Procedure documentationSetting the Status of a Change Locate this document in the navigation structure

 

You can change the status of a change for a QGM project. The initial status of a change is Open. Depending on the progress of the change and the project, you can switch the status to Completed or Withdrawn, if necessary.

Procedure

  1. On the Changes tab, choose   Set Status   Completed / Withdrawn  , to effect the following:

    • Completed: The change has been carried out and is finished. This means that this change will not be transferred to a new maintenance cycle during a maintenance cycle switch. Only changes with all transport requests imported successfully into a production system can be completed.

    • Withdrawn: If you set this status, the change is withdrawn. Changes which contain non-empty transport requests cannot be withdrawn.

  2. The change status has been switched.