You can enter serial numbers for components (if subcontracting type 1 and 2) for subcontracting purchase orders and purchase requisitions (purchasing documents).
Serial number management for purchase orders and purchase requisitions is based on the existing serial number management functions. For more information, see theSAPLibrary, under
Logistics
→
LO Logistics - General
→
Logistics Basic Data (LO-MD)
→
Serial Number Management (LO-MD-SN)
In the
General Plant Data/Storage 2
view of the material master, you must have assigned the serial number profile to the material.
You have created a serial number profile and assigned the following procedures to it:
For purchase orders, procedure POSL
For purchase requisitions, procedure PRSL
If you are using the pre-Enjoy purchasing transactions, you do this in Customizing for
Serial Number Management under Plant Maintenance and Customer Service
→
Master Data in Plant Maintenance and Customer Service
→
Technical Objects
→
Serial Number Management
→
Define Serial Number Profiles.
If you are using the Enjoy purchasing transactions, you do this in Customizing for
Materials Management
→
Purchasing
→
Purchasing Documents
→
Purchase Order
or
Purchase Requisition
→
Define Document Types.
If you make settings using the Enjoy purchasing transactions, they override any settings made for a particular serial number profile in the pre-Enjoy transactions.
For the Enjoy transactions you must additionally have:
Selected a document type (for example, a standard purchase order) with an item category used for subcontracting.
Set the serial number usage for the serial number profile in the
Maintenance View Serial Numbers in Purchasing Documents.
In the purchase order, you maintain serial numbers on the
Delivery Schedule
tab page.In the purchase requisition,you maintain serial numbers on the
Material Data
tab page. For both, you choose
Assign Serial Numbers.
For batch-managed materials, you cannot maintain serial numbers without maintaining the batch at component level.
For a recursive repair, where the same physical part is returned by the subcontractor with unchanged material and serial numbers (subcontracting type =
Refurbishment with Unchanged Material Number
), the serial number linked to the purchase order item is the same for the part provided to the subcontractor (component) and for the receiving part (item). An unplanned serial number change is possible during goods receipt if the subcontractor returns a completely different part.
For a planned modification, where the same physical part is returned by the subcontractor with a changed material number (subcontracting type =
Refurbishment with Changed Material Number
), the serial number linked to the purchasing document item is the same for the part provided to the subcontractor (component) and for the receiving part (item). An unplanned serial number change is possible during goods receipt if the subcontractor returns a completely different part.
If you have already entered the serial number in a PM/CS order, the serial numbers are copied to the purchase requisition from the object list of the PM/CS order. You can also enter the serial number manually. If you make a change to the PM/CS order and the object list differs from the purchase requisition object list, the system displays a pop up and you can decide if you want the updated serial numbers to be taken over to the purchase requisition. For more information, see MRO Subcontracting in Outbound Deliveries .
The actual status of the serial number regulates usability of specific serial numbers in purchasing documents. The serial number can be assigned to the purchasing document item if the following conditions are fulfilled:
Purchasing document is not blocked, deleted, or canceled (EKPO-LOEKZ)
Purchase order contains only one schedule line
Delivery completed indicator is not set
Purchase order item has item category
Subcontracting
(EKPO-PSTYP = 3).
Only the first schedule line is considered for serial number assignment.
The system copies the serial number from the purchase order item to the delivery item for outbound deliveries, or into material documents which are posted with reference to a purchase order.
The number of the serial numbers assigned to the purchasing document item equals the quantity of the purchasing document item.
The serial number in the purchasing document item belongs only to the main part to be repaired, that is the part with material provision indicator (MPI)
Rework Material to Subcontractor
. If the provided components (consumables) are also serialized, you can enter these serial numbers in the follow-on processes for creating the outbound delivery or posting the transfer posting to the subcontractor.
You can mark a component with this MPI only in the case of a recursive repair, that is subcontracting types
Refurbishment with Unchanged Material Number
or
Refurbishment with Changed Material Number
.
During conversion of a planned order into a purchase requisition, it is possible to transfer serial numbers.
Once you have entered serial numbers for a purchasing document item, you cannot change:
Item category
Subcontracting type
Main rework part on component level
If you want to make changes to the subcontract purchasing document for a serialized component, you have to delete the serial number assignment and change the purchasing document items.
If you change the purchasing document quantity, you might have to enter additional serial numbers (increase in purchasing document quantity) or delete existing serial numbers (decrease in purchasing document quantity).
You cannot carry out a new BOM explosion if you have already assigned serial numbers to the main rework material.