Show TOC

 Enhanced Maintenance of Objects with History Requirement

 

This feature allows you to do the following:

  • Maintain the data of the objects (product variant, product item variant, assembly header, and assembly item) historically. In Customizing, if the indicator for history requirement is selected, you can create new objects when an active change number is assigned and you can only edit an object that has a change number.

    Note Note

    When the switch for change number handling in the Additional Settings Customizing activity under Start of the navigation path Logistics - General Next navigation step Product Lifecycle Management (PLM) Next navigation step PLM Web User Interface Next navigation step Objects in PLM Web UI Next navigation step Product Structure and Assembly Management End of the navigation path is activated, the system behaves as follows:

    • If an active change number is assigned, a non-historical object without a change state can be edited.

    • If an active change number is assigned, and none of the change states of an object with history requirement is the same as the active change number, that object can be edited.

    • If an active change number is assigned, and an object with history requirement has the same change number as the active change number, the object with this change state can be edited.

    • If there is no active change number assigned, the objects cannot be edited.

    End of the note.
  • Maintain links (relationships involving product families, product views, and product items) between nodes historically. In Customizing (see below) , if you choose History Maintenance Required for a relationship, you can only maintain nodes with an active change number assigned.

Technical Details

Technical Name of Product Feature

ERP_802_PLM_OBJ_MAINT

Product Feature Is

Changed

Country Dependency

Valid for all countries

Software Component Version

  • PLMWUI 747

  • PLMWUI 748

Application Component

PLM-WUI-OBJ-PSM (Product Structure and Assembly Management)

Availability

  • SAP Enhancement Package 7 (SP12) for SAP ERP

  • SAP Enhancement Package 8 (SP02) for SAP ERP

Required Business Functions

/PLMU/IPPE_INT_5 (PLM, Product Structure and Assembly Management 5)

Effects on Customizing

The following Customizing activities affect the maintenance of data for variants and links on the PLM Web UI. You can find them under Start of the navigation path Logistics - General Next navigation step Product Lifecycle Management (PLM) Next navigation step Basic Data Next navigation step Integrated Product Engineering Next navigation step iPPE Object Administration End of the navigation path:

  • Define iPPE Variant Types

  • Define General iPPE Relationship Types