Model Mix Planning RunUsing this function, you can execute automatic planning over a long planning period which you divide into several planning horizons. This means you can gradually increase the level of detail of planning by using procedures of varying complexity in the corresponding planning horizons.
You have transferred the iPPE data from the DI System and have completed the master data in APO. See also: Maintaining Master Data
You have created a procedure package .
There are orders (evaluated) or requirements in the planning period.
You can start the planning run manually or schedule it as a background job. You can integrate the creation of a planning matrix to determine the component requirements in the planning run.
You can also integrate the model mix planning run as a heuristic in the production planning run of the APO System. For example, you can execute a planning run every night – updating your planning periodically.