CRM-R/3: Integration: Title: Initial Load Technical name: 0ME_TTL_INIT_P02
This process chain provides the entire integration scenario for the title. Only local process chains are executed in this process chain.
Execute this process chain if you have chosen an integration scenario for the title for CRM and R/3. Otherwise, you can start the local process chains you require individually.
This process chain initializes the delta procedure.
The process chain comprises the following local process chains:
CRM: Master Data on the Media Title (IP): Initial Load (0ME_TTL_IO_INIT_P03)
Material, Media Product, Media Product Family, Media Issue: Initial Load (0ME_TTL_INIT_P01)
CRM: Integration: Title (Material) -Title (IP): Full Upload (0ME_TTL_FULL_P01)
The process chain CRM: Integration: Title (Material) – Title (IP): Full Upload (0ME_TTL_FULL_P01) is not executed until the loading process is successfully completed for the two process chains CRM: Master Data on the Media Title (IP): Initial Load (0ME_TTL_IO_INIT_P03) and Material, Media Product Family, Media Issue: Initial Load (0ME_TTL_INIT_P01).
The hierarchy/attribute change run is executed in each of the local process chains, so that the local process chains can also be executed independently. Once the process chain is completed correctly, the master data is available in an active form in SAP BW.