Role Header (Attributes) Technical Name: 0RPM_ROLE_H
DataSource Type |
Attributes (Master Data) |
|---|---|
Application Components |
|
Available as from OLTP Release |
SAP xRPM 1.0 |
Available as from PlugIn Release |
N/A |
RemoteCube-Capable |
no |
This DataSource contains the fields necessary for extracting Attributes of a Role from Portfolio Management to the equivalent BW InfoObject Role GUID.
Delta update is not supported.
Fields in the Extract Structure |
Description of the Field in the Extract Structure |
Table of Origin |
Field in the Table of Origin |
Date of Change |
Type of Change |
|---|---|---|---|---|---|
ROLE_GUID |
Role GUID |
RPM_ROLE |
ROLE_GUID |
||
ROLE_ID |
Role External Id |
RPM_ROLE |
ROLE_ID |
||
PROJECT_GUID |
Project GUID |
RPM_ROLE |
TOP_PROJECT_GUID |
||
PROJECT_ID |
Project External Id |
CGPL_TASK |
EXTERNAL_ID |
||
CRITICALITY |
Criticality of role |
RPM_ROLE |
CRITICALITY |
||
PROJECT_CATEGORY |
Project Category |
RPM_PROJECT |
PROJECT_CATEGORY |
xRPM 2.0 SP01 |
- Field added - Selection possible |
EXPERT_ID |
Expert ID |
RPM_ROLE |
EXPERT_ID |
||
PLANNED_RESOURCE |
Planned resources for a given role |
RPM_ROLE |
PLANNED_RESOURCE |
||
DATE_PLANSTART |
Start Date |
CGPL_TASK |
PLANSTART |
||
DATE_PLANFINISH |
End Date |
CGPL_TASK |
PLANFINISH |
||
LOCATION |
Project Location |
RPM_ROLE |
LOCATION |
xRPM 2.0 SP01 |
- Field added |
GEOGRAPHY |
Project Geography |
RPM_PROJ_LOCAT |
GEOGRAPHY |
xRPM 2.0 SP01 |
- Field added |
COUNTRY |
Country Indic. |
RPM_PROJ_LOCAT |
COUNTRY |
xRPM 2.0 SP01 |
- Field added |
REGION |
Region (State, Province, County) |
RPM_PROJ_LOCAT |
REGION |
xRPM 2.0 SP01 |
- Field added |
POST_CODE |
Postal code |
RPM_PROJ_LOCAT |
POST_CODE |
xRPM 2.0 SP01 |
- Field added |
GLOBAL_ROLE_ID |
External ID |
N/A – derived from function |
xRPM 2.0 SP01 |
- Field added |
|
GLOBAL_ROLE_GUID |
Guid for application objects |
RPM_ROLE |
GLOBAL_ROLE_GUID |
xRPM 2.0 SP01 |
- Field added |
Projects with Project Type attributes:
Inactive in Portfolio Management (PTEST)
Inactive in Capacity Management (NOCAP)
Will not be extracted to BW if both conditions are satisfied ( example: PTEST = 'X'
AND
CTEST = 'X').
PTEST = 'X' projects will be filtered out of all Portfolio Management reports.
CTEST = 'X' projects will be filtered out of all Capacity Management reports.
All projects meeting the extraction conditions in (1.) will be uploaded if the project has the following approval statuses:
Approval Status -> Approval Status Group = Active (2) .
b. Approval Status -> Approval Status Group = To be approved (Proposal) (4).
The following attribute will be set to distinguish Active vs. Proposed projects:
PROPOSED = ' ' --> Active projects
PROPOSED = 'X' --> Proposed projects
Customers have the option to filter out project proposals from reports.