LaborTechnical Name: 0RC_CI_1
This InfoSource contains the following labor-related information:
Actual and scheduled working hours (regular working hours and overtime hours, for example)
Actual and scheduled pay (regular pay and overtime pay, for example)
Workload: expected manpower demand. It is forecasted by the SAP StaffWorks system but can also be adjusted manually by the store manager. It is represented as working time hours at job level.
Coverage statistics: reflects the staffing level (understaffing or overstaffing)
The information is presented at the following levels:
Store
Job
This InfoSource describes the file format of the current extraction file, that is, data delivered from SAP StaffWorks system. Since the data is not extracted from an R/3 system, no description for corresponding data elements or source fields is listed.
InfoObject |
Description |
Data Element |
Field in Transfer Structure |
Source |
0RC_STORE |
Store |
|||
0RC_JOB |
Job |
InfoObject |
Description |
Data Element |
Field in Transfer Structure |
Source |
0CALDAY |
Calendar day |
InfoObject |
Description |
Data Element |
Field in Transfer Structure |
Source |
0UNIT |
Unit of measurement |
|||
0CURRENCY |
Currency key |
InfoObject |
Description |
Data Element |
Field in Transfer Structure |
Source |
0RC_TOT_WL |
Total workload: the total number of forecast hours. This is the sum of flowed and filler workload. |
|||
0RC_FLOW_WL |
Flowed workload: workload driven by revenue, customer count or any other variable flowed task defined in the SAP StaffWorks system. Includes the static workload. |
|||
0RC_FILL_WL |
Filler workload: the fixed and variable filler hours allocated to the workload. In contrast to static workload that has to be scheduled for certain times (for example, 9 a.m. to 10 a.m.), filler workload refers to non-selling tasks that can be scheduled variably within certain time segments (for example, in the morning). As a rule, filler workload fills the gaps between workload peaks. |
|||
0RC_STAT_WL |
Static workload: work manually defined by the user. It is constant and independent of revenue, customer count or any business indicator or task defined in the SAP StaffWorks system (for example, the person who unlocks the store). |
|||
0RC_OVRSTFF |
Overstaffing: the number of hours in which the total workload is smaller than the number of people scheduled and not on an unpaid break. |
|||
0RC_UNDSTFF |
Understaffing: the number of hours in which the total workload is greater than the number of people scheduled and not on an unpaid break. |
|||
0RC_EFFHRS |
Effective hours: the scheduled hours minus overstaffed hours minus breaks. The values will be zero for events (for example, training or meetings) because these are not scheduled. From the perspective of the SAP StaffWorks system, effective hours are scheduled hours that match the workload hours. They are a general measure of schedule quality. |
|||
0RC_NEFFHRS |
Non-effective hours: the sum of overstaffing and understaffing for the day. The values will be zero for events (for example, training or meetings), fixed shift and temporary fixed shift job types, because these are not scheduled. Non-effective hours could, for example, be spent working on the shop floor and be paid while the SAP StaffWorks system calculated no corresponding demand. |
|||
0RC_COREAFT |
Core afternoon hours: the number of hours of core coverage as part of the workload for the afternoon segment. Core coverage means that employees with a particular job-specific minimum skill level must be scheduled. |
|||
0RC_COREEVN |
Core evening hours: the number of hours of core coverage as part of the workload for the evening segment. Core coverage means that employees with a particular job-specific minimum skill level must be scheduled. |
|||
0RC_COREMRN |
Core morning hours: the number of hours of core coverage as part of the workload for the morning segment. Core coverage means that employees with a particular job-specific minimum skill level must be scheduled. |
|||
0RC_PAIDBR |
Paid breaks: the number of hours of scheduled paid breaks |
|||
0RC_NPAIDBR |
Unpaid breaks: the number of hours of scheduled unpaid breaks. |
|||
0RC_MANEDIT |
Manual edits: manual changes to the system-generated staffing schedule. The number of scheduled days (shifts) that have been manually edited for every employee. Edits are attributed to each employee's primary job. |
|||
0RC_RULVIOL |
Weekly violations of scheduling rules assigned to the primary job |
|||
0RC_SCDHRS |
Scheduled hours: total number of scheduled hours that are not unpaid breaks. This includes all hours scheduled (regular, overtime, vacation, etc). |
|||
0RC_SCDEHRS |
Scheduled event hours: this key figure is the sum of all hours that employees with the selected job as their primary job spend in events (for example, training or meetings) . |
|||
0RC_SCDOHRS |
Overtime hours: the number of hours that will be paid at a multiple higher than one, regardless of the reason |
|||
0RC_SCDPAY |
Scheduled pay: The total payroll for the scheduled hours. This includes regular, overtime, vacation, etc. |
|||
0RC_SCDEPAY |
Scheduled event pay: the total payroll for the scheduled event hours, calculated from scheduled event hours |
|||
0RC_ACTRHRS |
Actual regular hours: actual (punched) paid non-overtime hours |
|||
0RC_ACTOHRS |
Actual overtime hours: actual paid overtime hours |
|||
0RC_ACTEHRS |
Actual event hours: actual hours spent in an event. These hours are assigned to the employee's primary job. |
|||
0RC_ACTPHRS |
Actual productive hours: within the SAP StaffWorks system, hours can be labeled as productive (for example, regular hours) or non-productive (for example, hours spent on vacation). Typically, productive hours are spent in direct support of the store’s operations |
|||
0RC_ACTNHRS |
Actual non-productive hours: within the SAP StaffWorks system, these are hours that can be labeled as productive (for example, regular hours) or non-productive (for example, hours spent on vacation). Typically, non-productive hours are not spent in direct support of the store’s operations. |
|||
0RC_ACTRPAY |
Actual regular pay: total payroll for the actual regular hours, as calculated by the SAP StaffWorks system |
|||
0RC_ACTOPAY |
Actual overtime pay: total payroll for the actual overtime hours, as calculated by the SAP StaffWorks system |
|||
0RC_ACTEPAY |
Actual event pay: the pay for the actual event hours |
|||
0RC_RPFLG |
Reporting flag: auxiliary variable indicating whether actual figures are available for the selected day and store. |
|||
0RC_LYRPFLG |
Last year reporting flag: auxiliary variable indicating whether actual figures are available for the selected day and store in the previous year. |
|||
0RC_ADJHOUR |
Adjusted hours: auxiliary variable used only to compute the calculated key figures net scheduled hours and projected hours. It equals zero if actual hours exists or it equals scheduled hours if no actual hours exists. |
|||
0RC_ADJPAY |
Adjusted pay: this is an auxiliary variable used only to compute the calculated key figures net scheduled pay and projected pay. It equals zero if actual pay figures exists or it equals scheduled pay if no actual pay exists. |