Store Operation SummaryTechnical Name: 0RC_CM01_Q0001
Based on the InfoCube: 0RC_MC01
This query allows managers ‘one-stop shopping’ for the key sales and labor metrics for a defined time period as it shows the principle key figures at a glance. The goal of placing all these key figures in one report is to save the user from having to look at five queries to find out whether everything is in order. Certain limitations require us to keep the reporting at the ‘total store’ level. If the user wants more detailed results, they can use the other sales and labor reports to find out what is specifically causing the problem.
Reporting is usually done on a daily basis. Primary target groups for this report: field management, corporate executives.
InfoObject |
Description |
— |
No filter criteria have been preset for this query. |
InfoObject |
Description |
0FISCPER |
Fiscal year/period |
0CALDAY |
Calendar day |
0RC_GEOLEV2 |
Division |
0RC_GEOLEV1 |
District |
0RC_STORE |
Store |
0RC_STORETY |
Store type |
0RC_DEPART |
Department |
0RC_JOB |
Job |
Note
0FISCPER enables users to navigate within the fiscal time periods covered by the system. As a rule, these periods are weeks or months, with week usually being used as fiscal period. The query always selects data of the current, the previous and the successive period.
Users can filter one or several fiscal periods by clicking 0FISCPER with the right mouse button and choosing
Select filter value
.
InfoObject |
Description of the InfoObject (and restriction or calculation formula) |
0CALWEEK |
Calendar week |
0RC_STORE__0RC_GEOLEV3 |
Region |
InfoObject |
Description of the InfoObject (and restriction or calculation formula) |
Total Store Projected Sales |
Equals sales where total store sales exist. If no total store sales is available, projected sales equals total store planned sales. |
Projected Actual Hours |
Equal total hours where total actual hours exist. If no total hours is available, projected hours equals scheduled hours. |
Projected Pay |
Equals total pay where total pay exists. If no total pay is available, projected pay equals scheduled pay. |
Projected Average Hourly Rate |
Projected pay divided by projected hours |
Projected Labor Percent |
Projected pay divided by projected sales |
Projected Sales Per Hour |
Projected sales divided by projected hours |
Schedule Effectiveness |
The number of effective hours compared with the scheduled hours (minus the scheduled event hours) plus understaffed hours. This value is used as a general measure of schedule quality. A rating of zero would indicate the worst possible schedule where all shifts were scheduled outside the workload. A rating of 100 would indicate a perfect schedule with all shifts scheduled exactly within the workload. |
Total Store Sales |
Total amount of store sales |
Total Hours |
Total number of hours actually worked, includes all types of hours (regular, overtime, event hours) |
Total Pay |
Total amount of wages |
Average Hourly Rate |
Total amount of wages divided by the total number of worked hours |
Store Labor Percent |
Payroll divided by total store sales |
Store Sales Per Hour |
Total store sales divided by total hours |