CTM Planning Procedure This process describes how
Capable-to-Match
(CTM)
proceeds in planning.
In order to execute
CTM
planning, you must have made the following settings:
You have setup master data under Master Data Setup .
In Customizing for
Multilevel Supply and Demand Matching (SDM)
under
you have made the basic settings for
CTM
planning.
The complete CTM planning process is depicted in the following graphic.

You create a CTM Profile .
You either start the
CTM
planning run directly from the
CTM
profile, or execute it in the background.
The system selects the demands and receipts in the planning period. Depending on the
Planning Mode and Deletion Modes
that you set in the
CTM
profile, the system may delete, for example, all non-firm orders.
The system prioritizes the demands according to the criteria that you have determined.
The system assigns the receipts and supplies to the stock categories .
The system selects the master and transaction data that is required for planning. The system transfers the data to the
CTM
planning engine on the optimization server.
CTM
planning performs the following planning steps:
Select procurement alternatives
Execute scheduling
Generate orders
Consume receipts and supplies
CTM
planning transfers the planning result to the
SAP
live
Cache
, in other words, the system saves the orders and pegging relationships in the
SAP
live
Cache
.