Connection to Production
Availability Check for Kits
Multilevel ATP Check
Source Determination in PP/DS
Determining Component Qty and Requirement Dates during MATP
Multilevel ATP Check in Two Steps
Controlling the ATP Check for Components
Rules-Based ATP Check at Component Level
Locking Concept
Persistency Indicator
Results Overview
ATP Tree Structures
Converting ATP Tree Structures
Recreating Procurement Proposals
Capable-to-Promise (CTP)
Planning Procedure in the CTP Process with Planning Procedure 3
Source Determination in PP/DS
Bucket-Oriented Capacity Check
Reserving Temporary Planned Orders via Temporary Requirements
Recreating Procurement Proposals
Comparison of Multilevel ATP Check and Capable-to-Promise (CTP)
Possible Combinations for Production