Start Level 1 Node: Connection to ProductionConnection to ProductionEnd Level 1 Node: Connection to Production
   Start Level 2 Node: Availability Check for KitsAvailability Check for KitsEnd Level 2 Node: Availability Check for Kits
   Start Level 2 Node: Multilevel ATP CheckMultilevel ATP CheckEnd Level 2 Node: Multilevel ATP Check
      Start Level 3 Node: Source Determination in PP/DSSource Determination in PP/DSEnd Level 3 Node: Source Determination in PP/DS
      Start Level 3 Node: Determining Component Qty and Requirement Dates during MATPDetermining Component Qty and Requirement Dates during MATPEnd Level 3 Node: Determining Component Qty and Requirement Dates during MATP
      Start Level 3 Node: Multilevel ATP Check in Two StepsMultilevel ATP Check in Two StepsEnd Level 3 Node: Multilevel ATP Check in Two Steps
         Start Level 4 Node: Controlling the ATP Check for ComponentsControlling the ATP Check for ComponentsEnd Level 4 Node: Controlling the ATP Check for Components
         Start Level 4 Node: Rules-Based ATP Check at Component LevelRules-Based ATP Check at Component LevelEnd Level 4 Node: Rules-Based ATP Check at Component Level
         Start Level 4 Node: Locking ConceptLocking ConceptEnd Level 4 Node: Locking Concept
      Start Level 3 Node: Persistency IndicatorPersistency IndicatorEnd Level 3 Node: Persistency Indicator
      Start Level 3 Node: Results OverviewResults OverviewEnd Level 3 Node: Results Overview
      Start Level 3 Node: ATP Tree StructuresATP Tree StructuresEnd Level 3 Node: ATP Tree Structures
         Start Level 4 Node: Converting ATP Tree StructuresConverting ATP Tree StructuresEnd Level 4 Node: Converting ATP Tree Structures
      Start Level 3 Node: Recreating Procurement ProposalsRecreating Procurement ProposalsEnd Level 3 Node: Recreating Procurement Proposals
   Start Level 2 Node: Capable-to-Promise (CTP)Capable-to-Promise (CTP)End Level 2 Node: Capable-to-Promise (CTP)
      Start Level 3 Node: Planning Procedure in the CTP Process with Planning Procedure 3Planning Procedure in the CTP Process with Planning Procedure 3End Level 3 Node: Planning Procedure in the CTP Process with Planning Procedure 3
      Start Level 3 Node: Source Determination in PP/DSSource Determination in PP/DSEnd Level 3 Node: Source Determination in PP/DS
      Start Level 3 Node: Bucket-Oriented Capacity CheckBucket-Oriented Capacity CheckEnd Level 3 Node: Bucket-Oriented Capacity Check
      Start Level 3 Node: Reserving Temporary Planned Orders via Temporary RequirementsReserving Temporary Planned Orders via Temporary RequirementsEnd Level 3 Node: Reserving Temporary Planned Orders via Temporary Requirements
      Start Level 3 Node: Recreating Procurement ProposalsRecreating Procurement ProposalsEnd Level 3 Node: Recreating Procurement Proposals
   Start Level 2 Node: Comparison of Multilevel ATP Check and Capable-to-Promise (CTP)Comparison of Multilevel ATP Check and Capable-to-Promise (CTP)End Level 2 Node: Comparison of Multilevel ATP Check and Capable-to-Promise (CTP)
   Start Level 2 Node: Possible Combinations for ProductionPossible Combinations for ProductionEnd Level 2 Node: Possible Combinations for Production