Start Level 1 Node: Integration of Master DataIntegration of Master DataEnd Level 1 Node: Integration of Master Data
   Start Level 2 Node: Master Data (General)Master Data (General)End Level 2 Node: Master Data (General)
   Start Level 2 Node: Integration of LocationsIntegration of LocationsEnd Level 2 Node: Integration of Locations
      Start Level 3 Node: Integration of Storage Location MRP AreasIntegration of Storage Location MRP AreasEnd Level 3 Node: Integration of Storage Location MRP Areas
         Start Level 4 Node: Storage Location Determination in Source Transfer to SAP APOStorage Location Determination in Source Transfer to SAP APOEnd Level 4 Node: Storage Location Determination in Source Transfer to SAP APO
         Start Level 4 Node: Distribution of Sources of SupplyDistribution of Sources of SupplyEnd Level 4 Node: Distribution of Sources of Supply
         Start Level 4 Node: Initial Transfer of Storage Location MRP AreasInitial Transfer of Storage Location MRP AreasEnd Level 4 Node: Initial Transfer of Storage Location MRP Areas
         Start Level 4 Node: Delete Assignment of a Material to an MRP AreaDelete Assignment of a Material to an MRP AreaEnd Level 4 Node: Delete Assignment of a Material to an MRP Area
   Start Level 2 Node: Integration of ProductsIntegration of ProductsEnd Level 2 Node: Integration of Products
      Start Level 3 Node: Integration of Location ProductsIntegration of Location ProductsEnd Level 3 Node: Integration of Location Products
      Start Level 3 Node: Product Master Data from SAP R/3 Material Master DataProduct Master Data from SAP R/3 Material Master DataEnd Level 3 Node: Product Master Data from SAP R/3 Material Master Data
   Start Level 2 Node: Integration of Classes and CharacteristicsIntegration of Classes and CharacteristicsEnd Level 2 Node: Integration of Classes and Characteristics
   Start Level 2 Node: Integration of BatchesIntegration of BatchesEnd Level 2 Node: Integration of Batches
   Start Level 2 Node: Integration of Setup GroupsIntegration of Setup GroupsEnd Level 2 Node: Integration of Setup Groups
   Start Level 2 Node: Integration of ResourcesIntegration of ResourcesEnd Level 2 Node: Integration of Resources
   Start Level 2 Node: Integration of Production Process ModelsIntegration of Production Process ModelsEnd Level 2 Node: Integration of Production Process Models
      Start Level 3 Node: Transfer of the Production Process Model (PPM)Transfer of the Production Process Model (PPM)End Level 3 Node: Transfer of the Production Process Model (PPM)
      Start Level 3 Node: Integration of Bills of MaterialIntegration of Bills of MaterialEnd Level 3 Node: Integration of Bills of Material
      Start Level 3 Node: Integration of RoutingsIntegration of RoutingsEnd Level 3 Node: Integration of Routings
      Start Level 3 Node: Delta Download for Bills of Material and RoutingDelta Download for Bills of Material and RoutingEnd Level 3 Node: Delta Download for Bills of Material and Routing
      Start Level 3 Node: Change Management: Bill of Material Items and Routing OperationsChange Management: Bill of Material Items and Routing OperationsEnd Level 3 Node: Change Management: Bill of Material Items and Routing Operations
      Start Level 3 Node: Recipes for Process IndustriesRecipes for Process IndustriesEnd Level 3 Node: Recipes for Process Industries
   Start Level 2 Node: Integration of Production Data Structures Generated from R/3 MasIntegration of Production Data Structures Generated from R/3 MasEnd Level 2 Node: Integration of Production Data Structures Generated from R/3 Mas
      Start Level 3 Node: Change Transfer: Production Data Structure and Bill of MaterialChange Transfer: Production Data Structure and Bill of MaterialEnd Level 3 Node: Change Transfer: Production Data Structure and Bill of Material
      Start Level 3 Node: Deleting a Production Data Structure (from R/3)Deleting a Production Data Structure (from R/3)End Level 3 Node: Deleting a Production Data Structure (from R/3)
      Start Level 3 Node: Integration of Order BOMs/WBS BOMsIntegration of Order BOMs/WBS BOMsEnd Level 3 Node: Integration of Order BOMs/WBS BOMs
   Start Level 2 Node: Supply Chain ModelSupply Chain ModelEnd Level 2 Node: Supply Chain Model
   Start Level 2 Node: Integration of Planning VersionsIntegration of Planning VersionsEnd Level 2 Node: Integration of Planning Versions
   Start Level 2 Node: Integration of External Procurement RelationshipsIntegration of External Procurement RelationshipsEnd Level 2 Node: Integration of External Procurement Relationships
      Start Level 3 Node: Integration of Purchasing Info RecordsIntegration of Purchasing Info RecordsEnd Level 3 Node: Integration of Purchasing Info Records
      Start Level 3 Node: Integration of ContractsIntegration of ContractsEnd Level 3 Node: Integration of Contracts
      Start Level 3 Node: Integration of Scheduling AgreementsIntegration of Scheduling AgreementsEnd Level 3 Node: Integration of Scheduling Agreements