Model Mix Planning
Maintaining Master Data
Planning Segment
Line Resource
Defining Line Resource Data Relevant for Scheduling
Defining Available Capacity
Midpoint Scheduling
Example: Midpoint Scheduling for Period Packages
Completing the Product Master Records
Creating and Assigning the Planning Calendar
Restrictions
Restriction Categories
Quantity Restriction
Application Example: Quantity Restriction
Spacing Restriction
Application Example: Spacing Restriction
Block Restriction
Application Example: Block Restriction
K-in-M Restriction
Application Example: 'K-in-M' Restriction
Position Restriction
Application Example: Position Restriction
Equal Distribution
Application Example: Equal Distribution Restriction
Restriction Maintenance: Process
Creating the Header Data
Defining Dependencies for a Restriction
Enhanced Dependency Editor (Dependencies Tab)
Customizing Settings for the Enhanced Editor
Defining the Dependency Editor
Restrictions on Fields in the Product Master
Start Date View
Vertical Period View
Examples for the Use of the Vertical Period View
Creating a Restriction (with the Dependency Editor)
Changing, Copying and Deleting Restrictions
User Settings for Maintaining Restrictions
Restriction Group
Creating the Restriction Group
Assigning Restrictions to a Restriction Group
Authorizations for Maintaining Restriction Groups
Including Restrictions in Planning
Procedures
Materials Planning Procedure
Percentage Smoothing
Determining the Priority for Percentage Smoothing
LP Procedure
Prioritized Equal Distribution
Genetic Algorithm (Single-Lines)
Genetic Algorithm (Multilines)
Multiline Planning Using the GA and Considering Line Priorities
Slotting Heuristic
Defining Procedure Packages
Defining the Horizons
Defining the Planning Basis & Planning Result for a Horizon
Rules for Creating a Procedure Package
Carrying Out Model Mix Planning
Planning Processes in Model Mix Planning
Single-line Planning
Multiline Planning Using the LP Procedure
Optimization
Model Mix Planning Run
Accessing the Model Mix Planning Run
Integrate as Heuristic in Production Planning Run
Interactive Sequencing
Calling Sequencing
Takt-Based Scheduling
Example 1: Takt Scheduling: Lot Size Greater Than or Equal to 1
Example 2: Takt Scheduling Within Production
Example 3: Fixed Order in the Past
Example 4: Fixed Order in the Near Future
Dispatching and Deallocating Orders
Fixing of Orders During Rescheduling by Drag and Drop
Other Processing Functions in the Sequence Schedule
Hiding/Showing and Enlarging Charts
Find and Select
Displaying Restriction Violations
Display Characteristics/Restrictions Using Visualization Profile
Defining Users and Line-Specific Layouts
Optimization in Sequencing
Optimizing Subsets
Display in the Product Planning Table
Display of the Restriction Hits
Link to External Production Control System
Transferring Order Sequences to Production
Testing the Order Sequence Transfer
Optimizing the Sequence in Production
Technical Background: Model Mix Planning
Technical Procedure Behind the Planning Run
Net Requirements Calculation
Scheduling
Midpoint Scheduling
Scheduling the Goods Receipt Processing Time