Distribution Requirements Planning (DRP)
Setting Up Master Data for DRP
DRP Matrix
Fixed Demands and Fixed Receipts
Extract Snapshot of DRP Matrix
DRP Rounding Rules
Aggregation of Demands Within the BOD
Product Group Procurement
DRP Approval
DRP Approval Rules
Running Management Approval
Displaying DRP Results
More Functions in DRP
DRP Horizons
DRP Stability Rules
Pre-Season Safety Stock Shift
Virtual Location for Consolidated Ordering
Supplier Shutdown
Substitution of Remanufactured Products
Anticipated Demand Coverage
Planning with Future Bills of Distribution (BODs)
Repair or Buy
Making Repair-or-Buy Decisions
Creating a Returns Forecast
Repair Decision
Displaying and Processing the Results of Repair or Buy Planning
Kit to Stock
Bringing Forward Net Demands During Shutdown Times
Displaying and Changing of Results of Kit-to-Stock Planning
Reorder-Point-Based Planning
Executing DRP for Products Planned on a Reorder Point Basis
Scheduling Planned Receipts
Displaying the Results of Reorder-Point-Based Planning