Master Data Setup This process describes the sequence in which you create the master data in
Advanced Planning and Optimization (
SAP APO)
for
Capable-to-Match
planning (
CTM
planning). You can transfer the master data from an
SAP R/3
system
and postprocess it in
SAP APO
or create it directly in
SAP APO
.
For more information, see Master Data .
You create a supply chain model in either the
Supply Chain Engineer
or in
Model and Planning Version Management.
You specify the supply chain model later in the
CTM
Profile
.
CTM
planning only uses the master data that you have assigned to this supply chain model.
You create a planning version for the supply chain model.
You specify the planning version later in the
CTM
profile.
You create the following master data and assign it to the supply chain model:
Sources of supply:
For products that are produced in-house, you create production process models (PPM) or generate production data structures (PDS) from
Integrated Product and Process Engineering (iPPE)
data or from
SAP R/3
data.
For more information, see Sources of Supply for In-House Production in CTM .
For products that have been procured externally, you create Transportation Lanes between the locations.