| pegging (SCM-APO-PPS) |
Procedure in Production Planning and Detailed Scheduling that establishes the relationship between receipt elements and requirements elements of a product within a location. Using pegging, the corresponding receipt elements are assigned to the requirements.
Two types of pegging are available:
With fixed pegging the assignment of a receipt element to a requirements element remains fixed during planning.
With dynamic pegging the assignment of receipt elements to requirements elements can change depending on the planning situation.