| makespan (SCM-APO-OPT) |
Time span between the earliest possible start date/time of a production plan specified by the user and the end of the last non-fixed operation in the optimized plan. This can include operations that the system moved to after the optimization horizon during optimization.
This time span can be reduced with optimization.