Start of Content Area
setup transition (SCM-APO-PPS)

Production Planning and Detailed Scheduling (SCM-APO-PPS)

Transition between two setup statuses of a resource.

A setup transition is defined by specifying two setup statuses - a preceding setup status and a subsequent setup status.

End of Content Area