|
propagation range (SCM-APO-PPS)
|
Production Planning and Detailed Scheduling (SCM-APO-PPS)
Selection of resources and products for which planning can be changed.
This includes:
- Creating and changing orders for these products
- Changing the capacity and the planning parameters of these resources
- Changing the resource schedule for these resources