| synchronous goods movement (IS-A-PPC) |
Goods movement to be processed synchronously. That is, the goods movement is posted immediately on transferring the backflushing data from the SCM system to the ERP system. You must set the indicator "synchronous posting GI" in the SCM product master for materials whose goods movements are to be posted immediately.
Goods receipts are always posted immediately irrespective of the indicator in the product master.