Use this window to select items for the MRP run.
Note This topic documents fields and other elements in this window that either are not self-explanatory or require additional information. End of the note. |
Includes all items with the Planning Method of MRP in the MRP run. When you select this radio button, the application does not display selected items in the table below. Note For a parent item of a bill of materials (BOM), all the child items in the BOM chain are included in the MRP run, regardless of their Planning Method attributes. The only exception is disassembly BOMs, for which the MRP does not calculate child items. End of the note. |
Includes selected items in the MRP run. To do so, proceed as follows:
Note If you have added an item and then deselected it in an MRP run, the next time you run this scenario, you can still see the item displayed in the table, deselected. This way you can include this item in the MRP run by selecting it. If you removed this item from an MRP run, the next time you run this scenario, you are not able to view it in the selected items table. If you want to include it in the MRP run, you have to add it again. End of the note. |
Opens the Items List — Selection Criteria window. You can filter items by item number, item group, and item properties. |
Removes all the items selected and displayed in the table. |
Select or deselect all the items displayed in the table. |
Opens a window that lets you update the following MRP planning parameters:
The updated value applies to all the items involved in the current scenario and MRP run. Your change here does not affect the item-specific definition on the Item Master Data: Planning Data Tab. |
Saves the MRP scenario at the current stage. Available only when you add a new scenario or update an existing one. Note You cannot save an MRP scenario if it is a simulation. End of the note. |