Start of Content Area

Procedure documentation Staffing Tasks with External Resources  Locate the document in its SAP Library structure

Use

You can use a shopping cart to order an external resource from Collaboration Projects (cProjects) for a project role.

You can schedule the external resource straight away as a resource with edit authorization or as part of the project role with edit authorization for a task.

Constraints

     You cannot use the external resource in the direct way as a responsible resource or as part of the responsible role.

     You cannot select the external resource as the decision maker for approving a phase.

     If you cancel the shopping cart for an external resource, the system automatically deletes the corresponding resource assignment in the project role and the references of the external resource to the assigned tasks (resources with authorization to carry out tasks).

Procedure

For more information, see Assignment of Project Roles to Tasks.

 

End of Content Area