Start Level 1 Node: Tutorial: Defining an Integration ProcessTutorial: Defining an Integration ProcessEnd Level 1 Node: Tutorial: Defining an Integration Process
   Start Level 2 Node: 1: Create an Integration Process1: Create an Integration ProcessEnd Level 2 Node: 1: Create an Integration Process
   Start Level 2 Node: 2: Receiving a Booking (Receive Step, Container Element)2: Receiving a Booking (Receive Step, Container Element)End Level 2 Node: 2: Receiving a Booking (Receive Step, Container Element)
   Start Level 2 Node: 3: Defining Settings for the Process Editor3: Defining Settings for the Process EditorEnd Level 2 Node: 3: Defining Settings for the Process Editor
   Start Level 2 Node: 4: Splitting a Message (Transformation)4: Splitting a Message (Transformation)End Level 2 Node: 4: Splitting a Message (Transformation)
   Start Level 2 Node: 5: Defining Dynamic Parallel Processing (Block)5: Defining Dynamic Parallel Processing (Block)End Level 2 Node: 5: Defining Dynamic Parallel Processing (Block)
   Start Level 2 Node: 6: Correlating a Booking and Confirmation (Correlation)6: Correlating a Booking and Confirmation (Correlation)End Level 2 Node: 6: Correlating a Booking and Confirmation (Correlation)
   Start Level 2 Node: 7: Sending a Booking for an Individual Flight (Send Step)7: Sending a Booking for an Individual Flight (Send Step)End Level 2 Node: 7: Sending a Booking for an Individual Flight (Send Step)
   Start Level 2 Node: 8: Defining a Counter (Container Operation)8: Defining a Counter (Container Operation)End Level 2 Node: 8: Defining a Counter (Container Operation)
   Start Level 2 Node: 9: Receiving a Confirmation (Receive Step)9: Receiving a Confirmation (Receive Step)End Level 2 Node: 9: Receiving a Confirmation (Receive Step)
   Start Level 2 Node: 10: Checking a Result (Switch)10: Checking a Result (Switch)End Level 2 Node: 10: Checking a Result (Switch)
   Start Level 2 Node: 11: Processing a Condition (Switch)11: Processing a Condition (Switch)End Level 2 Node: 11: Processing a Condition (Switch)
   Start Level 2 Node: 12: Confirming the Flight Trip (Transformation Step, Send Step)12: Confirming the Flight Trip (Transformation Step, Send Step)End Level 2 Node: 12: Confirming the Flight Trip (Transformation Step, Send Step)
   Start Level 2 Node: 13: Sending a Failure Notification for the Flight Trip (Transfor13: Sending a Failure Notification for the Flight Trip (TransforEnd Level 2 Node: 13: Sending a Failure Notification for the Flight Trip (Transfor
   Start Level 2 Node: 14: Canceling Flights (Block, Transformation, Send)14: Canceling Flights (Block, Transformation, Send)End Level 2 Node: 14: Canceling Flights (Block, Transformation, Send)