This InfoObject returns the master data for your production orders using the attributes.
Available as of Release | SAP enhancement package 2 for SAP NetWeaver 7.0 |
---|---|
External Hierarchy | Not available |
Object Type | Name | Technical Name |
---|---|---|
InfoObject | ILM Audit Package |
|
Object Type | Name | Technical Name |
---|---|---|
InfoObject | Plant |
|
InfoObject | Task list usage |
|
InfoObject | Material Number |
|
InfoObject | Base Unit of Measure |
|
InfoObject | Routing number of operations in the order |
|
InfoObject | Order Type |
|
InfoObject | Order category |
|
InfoObject | Reference order number |
|
InfoObject | Entered by |
|
InfoObject | Created on |
|
InfoObject | Last changed by |
|
InfoObject | Change date for Order Master |
|
InfoObject | Description |
|
InfoObject | Long Text Exists |
|
InfoObject | Company Code |
|
InfoObject | Object number |
|
InfoObject | Deletion flag |
|
InfoObject | Business Area |
|
InfoObject | Controlling Area |
|
InfoObject | Cost collector key |
|
InfoObject | Identifier for statistical order |
|
InfoObject | Object ID |
|
InfoObject | Identifier for planning with line items |
|
InfoObject | Application |
|
InfoObject | Costing Sheet |
|
InfoObject | Overhead key |
|
InfoObject | Processing group |
|
InfoObject | Network profile |
|
InfoObject | Project definition |
|
InfoObject | Work Breakdown Structure Element (WBS Element) |
|
InfoObject | Internal counter |
|
InfoObject | Internal counter |
|
InfoObject | Costing variant for planned costs |
|
InfoObject | Costing variant for actual costs |
|
InfoObject | Results Analysis Key |
|
InfoObject | Variance Key |
|
InfoObject | Indicator: Default value work is relevant |
|
InfoObject | Profit Center |
|
InfoObject | Internal counter |
|
InfoObject | Usage of the condition table |
|
InfoObject | Object types of the CIM resource |
|
InfoObject | Object ID of the resource |
|
InfoObject | Indicator: Do not schedule automatically |
|
InfoObject | Indicator: Do not cost automatically |
|
InfoObject | Indicator: Order is part of collective order |
|
InfoObject | Tax Jurisdiction |
|
InfoObject | Object Class |
|
InfoObject | Effective for Materials Planning |
|
InfoObject | Number of superior network |
|
InfoObject | Routing number of operations in the order |
|
InfoObject | Scheduled float before production in days |
|
InfoObject | Scheduled float after production in days |
|
InfoObject | Search procedure for batch determination |
|
InfoObject | Leading order in current processing |
|
InfoObject | Outline start of collective network (date) |
|
InfoObject | Start time of a collective order |
|
InfoObject | Order with Multiple Items |
|
InfoObject | Technical completion date |
|
InfoObject | Sales Order Number |
|
InfoObject | Item number in Sales Order |
|
InfoObject | Production Scheduling Profile |
|
InfoObject | Indicator: Components will not be costed |
|
InfoObject | Settlement cost element |
|
InfoObject | Estimated total costs of order |
|
InfoObject | Do not calculate planned costs for order |
|
InfoObject | Indicator: Direct cost collector |
|
InfoObject | Cost collector for production process PROCNR |
|
InfoObject | Production Process |
|
InfoObject | Process Category (Procurement/Consumption) |
|
InfoObject | Refurbishment order indicator (PM) |
|
InfoObject | Accounting Indicator |
|
InfoObject | Address number |
|
InfoObject | OCM: Result of comparison of two order objects |
|
InfoObject | Process that has lead to the change of an object |
|
InfoObject | Changed at |
|
InfoObject | Collective order with/without automatic goods movement |
|
InfoObject | Investment measure profile |
|
InfoObject | Location plant |
|
InfoObject | Requesting company code |
|
InfoObject | Requesting cost center |
|
InfoObject | Scale of investment objects |
|
InfoObject | Reason for investment |
|
InfoObject | Reason for environmental investment |
|
InfoObject | Identical object |
|
InfoObject | Costs are updated |
|
InfoObject | Change indicator |
|
InfoObject | Responsible cost center |
|
InfoObject | Functional Area |
|
InfoObject | Status of an order in a split hierarchy |
|
InfoObject | Joint venture |
|
InfoObject | Recovery Indicator |
|
InfoObject | Equity type |
|
InfoObject | Joint Venture Object Type |
|
InfoObject | JIB/JIBE Class |
|
InfoObject | JIB/JIBE Subclass A |
|
InfoObject | JV original cost object |
|
InfoObject | CU: Order is Used for Compatible Units |
|
InfoObject | CU: Construction Measure Number |
|
InfoObject | CU: Automatic Copy of Estimated Costs |
|
InfoObject | CU: Internal CU Number in a Work Order |
|
InfoObject | UUID in X form (binary) |
|
InfoObject | CU: Design Number |
|
InfoObject | CU: GUID of Design Document |
|
InfoObject | Routing number of operations in the order |
|
InfoObject | Maintenance Planning Plant |
|
InfoObject | Factor for Quantity-Based Settlement |
|
InfoObject | Combination Indicator |
|
InfoObject | Claim creation control indicator |
|
InfoObject | Claim inconsistency with order indicator |
|
InfoObject | Claim update trigger point from service order |
|
InfoObject | Number of standard networks to be copied |
|
InfoObject | Work Breakdown Structure Element (WBS Element) |
|
InfoObject | Indicator: Refill dialog table for scheduling |
|
InfoObject | Indicator: Direct function call |
|
InfoObject | Scrap percentage |
|
InfoObject | Order item number |
|
InfoObject | Description of scheduling type |
|
InfoObject | Description of scheduling type |
|
InfoObject | Set of dates for network |
|
InfoObject | Indicator: Order still to be printed (internal field) |
|
InfoObject | Indicator: Release order immediately |
|
InfoObject | Indicator: Convert planned order with RSNUM |
|
InfoObject | Superior assembly |
|
InfoObject | Standard WBS element |
|
InfoObject | Ind.: Book delivery information |
|
InfoObject | Indicator: Cost automatically |
|
InfoObject | Indicator: Schedule automatically |
|
InfoObject | Indicator: Order is (partially) released |
|
InfoObject | Indicator: Order is technically completed |
|
InfoObject | Indicator: Order has dependent orders |
|
InfoObject | Scheduled start date of collective order (date) |
|
InfoObject | Actual start collective order (date) |
|
InfoObject | Reservation Relevance/Generation of Purchase Requisition |
|
InfoObject | UTC Time Stamp in Long Form (YYYYMMDDhhmmssmmmuuun) |
|
InfoObject | Maintenance order planning indicator |
|
InfoObject | Reference Element PM/PS |
|
InfoObject | Plant associated with main work center |
|
InfoObject | Main work center for maintenance tasks |
|
InfoObject | Indicator: Order Printing Requested |
|
InfoObject | Flag: Maintenance plan call |
|
InfoObject | Indicator: Order Creation from PM Notification |
|
InfoObject | Object number |
|
InfoObject | Master Equipment |
|
InfoObject | PM/CS Order Code Indicating Rotable Process |
|
InfoObject | CMC: Priority Manually Changed |
|
InfoObject | Priority for PM/CS Orders |
|
InfoObject | CMC: Use Minimum or Standard TWT from PP Matrix |
|
InfoObject | Unique Item Identifier |
|
InfoObject | Object types of the CIM resource |
|
InfoObject | Work Breakdown Structure Element (WBS Element) |
|
InfoObject | Cost Center |
|
InfoObject | Main Asset Number |
|
InfoObject | Asset Subnumber |
|
InfoObject | Object reference indicator |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | ABC indicator for technical object |
|
InfoObject | Maintenance Plan Call Number |
|
InfoObject | PM Order: Reference Date |
|
InfoObject | Time of Reference Date |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change indicator |
|
InfoObject | Change Number |
|
InfoObject | Change Number |
|
InfoObject | Change Number |
|
InfoObject | Execution Factor |
|
InfoObject | Order Category Indicator Plant Maintenance |
|
InfoObject | Name of Person Reponsible for System |
|
InfoObject | Date until which the system is available |
|
InfoObject | Time until which the system is available |
|
InfoObject | Date from which the system is available |
|
InfoObject | Time from Which System is Available |
|
InfoObject | Syst.Condition |
|
InfoObject | Short text for the work center |
|
InfoObject | Priority Type |
|
InfoObject | Request ID |
|
InfoObject | Order Number |
|
InfoObject | Order Number |
|
InfoObject | Order Number |
|
InfoObject | Indicator: Calculate capacity requirements |
|
InfoObject | Indicator: Display operation overview |
|
InfoObject | Base quantity |
|
InfoObject | Base quantity |
|
InfoObject | Base quantity |
|
InfoObject | Assembly |
|
InfoObject | Plant Section |
|
InfoObject | ID of the capacity requirements record |
|
InfoObject | ID of the capacity requirements record |
|
InfoObject | ID of the capacity requirements record |
|
InfoObject | Indicator: Scheduling allowing for breaks |
|
InfoObject | Company Code |
|
InfoObject | Addresses: Address Number |
|
InfoObject | Single-Character Flag |
|
InfoObject | Lot Size for Product Costing |
|
InfoObject | Ind.: Authorization exists |
|
InfoObject | Confirmation: Degree of processing |
|
InfoObject | General counter for order |
|
InfoObject | Order priority |
|
InfoObject | Scrap percentage |
|
InfoObject | User status active |
|
InfoObject | Field displaying user status |
|
InfoObject | Date of BOM Explosion/Routing Transfer |
|
InfoObject | MRP controller for the order |
|
InfoObject | FAUF: Reading of master data executed |
|
InfoObject | Actual release date |
|
InfoObject | Planned release date |
|
InfoObject | Scheduled release date |
|
InfoObject | Scheduled release date (forecast) |
|
InfoObject | Confirmed Order Finish Date |
|
InfoObject | Confirmed Order Finish (Time) |
|
InfoObject | Expected variance from planned qty to be delivered to stock |
|
InfoObject | Finish date (forecast) |
|
InfoObject | Scheduled forecast finish |
|
InfoObject | Actual Finish Date |
|
InfoObject | Basic finish date |
|
InfoObject | Scheduled finish |
|
InfoObject | Forecast finish (time) |
|
InfoObject | Scheduled forecast finish time |
|
InfoObject | Basic Finish (Time) |
|
InfoObject | Scheduled Finish (Time) |
|
InfoObject | Common Unit of Measure for All Order Items |
|
InfoObject | Forecast start date |
|
InfoObject | Scheduled forecast start |
|
InfoObject | Actual start date |
|
InfoObject | Basic start date |
|
InfoObject | Scheduled start |
|
InfoObject | Forecast start (time) |
|
InfoObject | Scheduled start time (Forecast) |
|
InfoObject | Actual Start (Time) |
|
InfoObject | Basic Start Time |
|
InfoObject | Scheduled Start (Time) |
|
InfoObject | Delivered quantity |
|
InfoObject | Confirmed Scrap from Order Confirmation |
|
InfoObject | Yield confirmed from order confirmation |
|
InfoObject | Sales Order Number |
|
InfoObject | Sales Order Item |
|
InfoObject | Selection: Consignment stock |
|
InfoObject | Account assignment |
|
InfoObject | Order conversion with the possibility of making corrections |
|
InfoObject | Selection: Returnable packaging |
|
InfoObject | Left node in collective order |
|
InfoObject | Long text exists |
|
InfoObject | Material Number for Order |
|
InfoObject | Material description |
|
InfoObject | Expected yield variance |
|
InfoObject | Outline finish of collective order (date) |
|
InfoObject | Outline finish time |
|
InfoObject | Date for routing transfer |
|
InfoObject | Order item number |
|
InfoObject | Check with requirements |
|
InfoObject | Right node of a collective order |
|
InfoObject | Completion confirmation number for the operation |
|
InfoObject | To selection date |
|
InfoObject | From selection date |
|
InfoObject | System Status |
|
InfoObject | Indicator: Collective conversion of planned orders |
|
InfoObject | Indicator: Change to Scheduled Dates |
|
InfoObject | Application code, where the order/network was created |
|
InfoObject | Object ID of the resource |
|
InfoObject | Object types of the CIM resource |
|
InfoObject | Apportionment Structure |
|
InfoObject | Configuration (internal object number) |
|
InfoObject | Seq. number order |
|
InfoObject | Time created |
|
InfoObject | Date of Technical Inspection |
|
InfoObject | Valid-From Date |
|
InfoObject | Valid-From Date |
|
InfoObject | Standing order number |
|
InfoObject | Additional Device Data |
|
InfoObject | Counter for additional criteria |
|
InfoObject | Sort field |
|
InfoObject | Equipment Number |
|
InfoObject | Production Supervisor |
|
InfoObject | Scheduling Margin Key for Floats |
|
InfoObject | General Flag |
|
InfoObject | General Flag |
|
InfoObject | Serial Number with Incomplete Equipment |
|
InfoObject | Ind: Address update must be called up |
|
InfoObject | Indicator: relationships |
|
InfoObject | Indicator: Order (network etc.) still to be calculated |
|
InfoObject | Indicator: WM relevant change made |
|
InfoObject | Ind: Confirmation to be saved |
|
InfoObject | Ind: Services must be updated |
|
InfoObject | Indicator: Scheduling must take data changes into account |
|
InfoObject | Indicator: Scheduling is carried out at least once |
|
InfoObject | Indicator: Operation changes relevant to scheduling |
|
InfoObject | Release period (in days) |
|
InfoObject | Total order quantity |
|
InfoObject | Total scrap quantity in the order |
|
InfoObject | Serial Number |
|
InfoObject | Business Area |
|
InfoObject | PM request: History date |
|
InfoObject | Level (in multi-level BOM explosions) |
|
InfoObject | Maintenance activity type |
|
InfoObject | ILOA Individual |
|
InfoObject | Location and account assignment for technical object |
|
InfoObject | Planner Group for Customer Service and Plant Maintenance |
|
InfoObject | Name of the Maintenance Planner Group |
|
InfoObject | Name of Person Responsible for Technical Inspection |
|
InfoObject | Maintenance Planning Plant |
|
InfoObject | Status Profile |
|
InfoObject | Calendar Selection for Order |
|
InfoObject | Version of Available Capacity |
|
InfoObject | Ind: do not create capacity requirements |
|
InfoObject | Controlling Area |
|
InfoObject | Customer Number |
|
InfoObject | Indicator for type of availability check |
|
InfoObject | Order balance in controlling-area currency |
|
InfoObject | Order number |
|
InfoObject | Line hierarchy |
|
InfoObject | Object ID of the Work Center |
|
InfoObject | To Lot Size |
|
InfoObject | Lot size divisor |
|
InfoObject | To lot size |
|
InfoObject | From Lot Size |
|
InfoObject | From Lot Size |
|
InfoObject | Material Number |
|
InfoObject | Material Number |
|
InfoObject | Service product |
|
InfoObject | Unit for Breakdown Duration |
|
InfoObject | Number of superior order |
|
InfoObject | Base Unit of Measure |
|
InfoObject | Base Unit of Measure |
|
InfoObject | Service product quantity |
|
InfoObject | Actual finish for collective order (date) |
|
InfoObject | Scheduled finish date of collective order (date) |
|
InfoObject | Actual finish collective order (time) |
|
InfoObject | Scheduled finish collective order (time) |
|
InfoObject | Indicator for the account assignment of a network(hdr/act.) |
|
InfoObject | Next planned date |
|
InfoObject | /RWC/CNSTT_IST |
|
InfoObject | Scheduled start collective order (time) |
|
InfoObject | Type of network |
|
InfoObject | Object ID |
|
InfoObject | Object list number |
|
InfoObject | Order balance in order currency |
|
InfoObject | Control cycle number |
|
InfoObject | Kanban item number / control cycle item |
|
InfoObject | Description of the basis for scheduling |
|
InfoObject | Group Counter |
|
InfoObject | Application of the task list |
|
InfoObject | Task list unit of measure |
|
InfoObject | Key for Task List Group |
|
InfoObject | Task List Type |
|
InfoObject | Plan Version |
|
InfoObject | Object Type of CIM Resources for Work Center |
|
InfoObject | Maintenance processing stage |
|
InfoObject | Item number of the SD document |
|
InfoObject | Item number of the SD document |
|
InfoObject | Object ID of PP work center |
|
InfoObject | Priority |
|
InfoObject | Checking rule for the availability check |
|
InfoObject | Indicator: Project date definition |
|
InfoObject | Indicator: Project summarization via master data charact. |
|
InfoObject | Basis for scheduling |
|
InfoObject | Notification No |
|
InfoObject | Inspection Lot Number |
|
InfoObject | Room |
|
InfoObject | Reduction indicator for scheduling |
|
InfoObject | Reduction indicator for scheduling (forecast) |
|
InfoObject | Description of reduction indicator |
|
InfoObject | Revision level |
|
InfoObject | Revision for Plant Maintenance and Customer Service |
|
InfoObject | Indicator: Backflush |
|
InfoObject | Total confirmed rework quantity |
|
InfoObject | Number of reservation/dependent requirements |
|
InfoObject | Number of reservation/dependent requirements |
|
InfoObject | Upgrade Order Indicator |
|
InfoObject | Scenario or Subscreen Category |
|
InfoObject | Float after production (in days) |
|
InfoObject | Division |
|
InfoObject | Alternative BOM |
|
InfoObject | BOM Usage |
|
InfoObject | BOM status |
|
InfoObject | BOM category |
|
InfoObject | Bill of material |
|
InfoObject | Asset location |
|
InfoObject | Maintenance plant |
|
InfoObject | Field defined as in SY-TABIX |
|
InfoObject | Scheduling note from order scheduling |
|
InfoObject | Scheduling type |
|
InfoObject | Scheduling type (forecast) |
|
InfoObject | Text, 40 Characters Long |
|
InfoObject | Description of the planning type |
|
InfoObject | Functional Location |
|
InfoObject | Date of the last scheduling |
|
InfoObject | Indicator: long text changed |
|
InfoObject | Category of object causing the load (order category) |
|
InfoObject | Responsible planner group/department |
|
InfoObject | Responsible planner group/department |
|
InfoObject | Person/Group responsible for the network |
|
InfoObject | Sales and Distribution Document Number |
|
InfoObject | Sales Organization |
|
InfoObject | Advance Shipment Indicator |
|
InfoObject | Float before production (in days) |
|
InfoObject | Version inactive indicator |
|
InfoObject | Number or description of a version |
|
InfoObject | Sales document version number |
|
InfoObject | Distribution Channel |
|
InfoObject | Maintenance item |
|
InfoObject | Maintenance Plan |
|
InfoObject | Path (for multi-level BOM explosions) |
|
InfoObject | Path (for multi-level BOM explosions) |
|
InfoObject | Factory Calendar |
|
InfoObject | Checkbox |
|
InfoObject | Checkbox |
|
InfoObject | Checkbox |
|