The Universal Worklist (UWL) mechanism for refreshing completed items enables automatic
update of the UWL task list when a workitem originating from
WebFlowConnector is completed.
Note
Refresh for completed items is applicable to WebFlowConnector
only.
When items are set to status
Completed, they are removed
from the
New and
In Progress view in the UWL
inbox. The end user does not need to wait for page refresh or use the refresh function
to update the inbox.
Refresh of completed items can be enabled on registered
WebFlowConnectors or while registering a new
WebFlowConnector with the UWL service after defining a new system
connection.
For more information, see UWL Connectors.
Note
Enabling the refresh of completed items for a WebFlowConnector
might lead to undesired changes in the reaction time of UWL. System utilization may
increase and lower performance results may occur.
Prerequisites for Enabling Refresh of Completed Items
-
In the portal you have configured an RFC destination for connection with the back-end
system.
-
The back-end system has the SAP_ABA and
SAP_BASIS components.
-
The user on the back-end system, that you used to configure logon data in the portal
RFC destination, must have the S_RFC_ADM authorization object
assigned. The Authorization Field ACTVT must have value
"01: Create.
Note
Please, make sure that the prerequisites from the previous section are fulfilled first.
Then, proceed with the next steps.
Activation in Back-end system
- Log on to the back-end system, on which you want the refresh for completed items
to work.
- Open the SWPA and select the Create Work Item
Events for UWL checkbox.
- Save your changes.
Activation in Portal UWL
- In the portal, navigate to .
- Select the New button to configure the connector. Enter
the system alias you are using. You can also select an already registered
WebflowConnector and choose the
Edit button.
- From the Connector Type dropdown list, choose
WebFlowConnector.
- Fill in the configuration details for the connector.
- Select the Refresh completed items checkbox.
- To define the time period for UWL task list update, enter a number (in seconds)
in the Refresh Period for Completed Items (in Seconds)
field.
Note Enter a value between 5 and 20 that is a multiple of 5 (for
example, 10 or 15 ).
- To save the current connector registration, choose the
Save button.
- Activate and register the connector.