Technical name: 0APO_CHKHOR
Use
Defines a time interval (checking date + period), during which an ATP check can be made for a product. If the requirements date is within this time interval, the check is made. Requirements that fall after the end of the checking horizon, are not checked, which means that their full amount is confirmed.
Technical data
|
Available as of release |
SAP APO 3.0A |
|
Reference characteristic |
Does not exist |
|
External hierarchy |
Does not exist |
|
Compounding |
Does not exist |