Characteristics in Supply Chain Management
APO ATP Group
APO Demand Planner
APO Demand Planning Version
APO Active Variant of a Resource’s Available Capacity
APO Activities are only Allowed to Begin at Start of a Bucket
APO Activities are Allowed to Overlap
APO Order Creation Date
APO Order Creation Time
APO Creation Date
APO Creation Time
APO Date and Time of Creation
APO Number of Periods that Capacity Refers to
APO Order
APO Pegged Requirements Order Number
APO Subassembly Planning
APO Customer Requirement Date
APO Customer Requirement Time
APO Start of PPM Validity
APO Created By
APO Changed By
APO Procurement Indicator
APO Description for PP Requirements Profile
APO Consider Bucket Capacity
APO Resource Dimension
APO Purchasing Planner
APO Operation End Date
APO End of PPM Validity
APO End of an Order’s Final Activity
APO Last Order Activity End Date
APO Last Order Activity End Time
APO Operation End Time
APO Lot-for-Lot Order Quantity
APO External Capacity
APO External Cost Function (SNP)
APO External Location
APO External Number for PP Requirements Profile
APO External Order Type
APO External Configurable Material
APO Production Date of an Order’s Primary Product
APO Production Time of an Order’s Primary Product
APO Fixed Lot Size
APO Indicator: Maximum from Safety Stock/Float After Production
APO Available Resource Validity Period (Days in the Past)
APO Available Resource Validity Period (Days in the Future)
APO Validity End Date
APO Validity End Date
APO Validity Start Date
APO Validity Period
APO Handling Resource
APO Internal Order Type
APO Take Capacity Load of the Resource into Account
APO Category Group
APO BOM Explosion Indicator
APO Configurable Material
APO Product Allocation Determination Procedure
APO Sequence of Product Allocation Procedures
APO Customer
APO Customer Material Number
APO Loading Group
APO Storage Location
APO Storage Resource
APO Location Attribute 1-5
APO Location Product Attribute 1-5
APO Location Type
APO Lot Size Profile/Range of Coverage Profile
APO Lot Size Profile/Range of Coverage Profile - Description
APO Lot-Size Calculation in Sales Order Planning
APO Product Completion Level (CTM)
APO Material Memo Exists
APO Maximum Resource Capacity Overload
APO Minimum Resource Capacity Load Utilization
APO ND Start of Planning Horizon
APO ND Planning Horizon End Date
APO ND Planning Run End Time
APO ND Fixed Cost Name
APO ND Planning Run
APO ND Planning Procedure
APO ND Planning Run Start Time
APO ND Status of a Location (new, to be closed etc.)
APO ND New Transportation Lane (Yes/No)
APO ND Excluded Transportation Lane (Yes/No)
APO Outbound Handling Resource
APO PPM Description
APO Period Type
APO Planner is a Demand Planner
APO Planner is a Purchasing Planner
APO Planner is a Production Planner
APO Planner is an SNP Planner
APO Planner is a Transportation Planner
APO Planning in the Production Planning Areas
APO Planning with Reference to Product Shelf Life
APO PP/DS Planning Horizon in Calendar Days
APO Planning Strategy
APO Planning Procedure for Production Planning
APO Planning Version is Active for PP/DS
APO Planning Version is Active for SNP
APO Product Attribute 1-5
APO Production Planner
APO Checking Horizon in Days
APO Check Mode
APO Reduce Resource Gap
APO Resource has Storage Attributes
APO Resource is a Bottleneck Resource
APO Resource Category
APO Resource Type
APO Rounding Profile
APO Setup Matrix
APO SNP Planner
APO Dependent Demand Indicator
APO Lot Size Calculation Float After Production
APO Start of First Order Activity
APO Start Date of First Order Activity
APO Operation Start Date
APO Start Location (of a Transportation Lane)
APO Start Location Type (for Transportation Lanes)
APO Operation Start Time
APO Operation Start Time
APO Start Time of First Order Activity
APO Stacking Factor
APO Transportation Group
APO Means of Transport
APO Means of Transport
APO Transportation Planner
APO OLTP Order Type
APO VMI Purchasing Group
APO VMI Location
APO Loss Factor when Deriving the Available Bucket (percentage)
APO Backward Consumption Period
APO Forward Consumption Period
APO Consumption Mode
APO Operation
APO Plant for MRP Area
APO Time Zone
APO Target Location (of a Transportation Lane)
APO Target Location Type (for Transportation Lanes)
APO Change Date
APO Change Time
APO Date or Time of Change
APO Location
APO Location Product
APO Model
APO Planner
APO Planning Version
APO Product
APO Production Process Model
APO Resource
APO Upload Label
Different Invoicing Party
Evaluated Receipt Settlement
Ordering Address
Batch Number
Purchasing Document Type
Purchasing Document Category
Purchasing Organization
Purchasing Group
Schedule Line Date
Schedule Line Time Spot
“Inward Delivery Completed” Indicator
Final Invoice Indicator
Purchasing Document Entry Date
Scoring Method
Document Creation Time
Manufacturer Part
Indicator for Cancellation of Data
Indicator: Quantity Variance Relevant
Item Counter Indicator
Date Variance Indicator
Condition Granter
Start of Validity Period
End of Validity Period
Service Number
Supplying Vendor
Vendor from Whom the Material is Procured
Vendor to Whom Partner Roles Have Been Assigned
Vendor Number
Supplying Plant to Which Partner Roles Have Been Assigned
Logical System
Logical System Backend
Material Number
Number of Purchasing Info Record
Number of Condition Record
Number of Principal Agreement
Item of Principal Agreement
Invoicing Party
Main Evaluation Criterion
Status of Purchasing Document
Subcriterion
Purchasing Info Record Category
GR-Based Invoice Verification
Material Group
Goods Supplier
Plant
Downtime Element
Downtime Category
Help Characteristic Downtime Counter
Division
Sales Organization
Distribution Channel
Completion Type
Departure Loading Point
Departure Shipping Point
Departure Plant
Point of Departure: Point
Point of Departure: Customer
Point of Departure: Vendor
Processing Control
Number of Stages
Number of Shipments
Number of Shipments with Shipment Stage Information
Number of Shipments with Capacity Information
Service Level
Distance
Average Gross Weight
Average Net Weight
Average Volume
Planned Total Transportation Time
Planned Loading Duration
Planned Transportation Time
Planned Waiting Time
Planned Physical Transportation Time (Travel Time)
Capacity (Weight)
Capacity (Volume)
Leg Indicator
Maximum Gross Weight
Maximum Net Weight
Maximum Volume
Minimum Gross Weight
Minimum Net Weight
Minimum Volume
Partner Functions
Freight Partner Role
Planned Shipment-Completion Date
Planned Loading-Start Date
Planned Loading-End Date
Planned Check-In Date
Planned Shipment-Start Date
Planned Shipment-End Date
Shipment-Costs Item Type
Special Processing Indicator
Sum of Gross Weights
Sum of Net Weights
Sum of Volumes
Actual Total Transportation Time
Actual Loading Duration
Actual Transportation Time
Actual Waiting Time
Actual Physical Transportation Time (Travel Time)
Actual Shipment-Completion Date
Actual Loading-Start Date
Actual Loading-End Date
Actual Check-In Date
Actual Shipment-Start Date
Actual Shipment-End Date
Shipment Type
Transportation Planning Point
Shipping-/ Receiving Point
Shipping Type
Shipping Condition
Delay in Shipment Completion
Delay in Loading Start
Delay in Loading End
Delay in Check-In
Delay in Shipment Start
Delay in Shipment End
Plant from the Delivery Item
Plant in the Shipment-Cost Item
Destination Loading Point
Destination Shipping Point
Destination Plant
Destination: Point
Destination: Customer
Destination: Vendor