Extraction of Planning Data You use the report RMDMRPEXTRACT01 to very quickly extract mass data from Material Requirements Planning for further processing in other applications.
The extraction report can either be run online or scheduled periodically in the background. Transaction MDEX is available for the latter purpose.
Report RMDMRPEXTRACT02 is available with the same functions for long-term planning. Use the transaction MSEX to schedule this report periodically.
You have defined a filter for the targeted extraction of certain MRP elements and stock categories that lie in a certain horizon. You define the filter in Customizing for Material Requirements Planning under
You have defined an
Extraction Mode
in Customizing for Material Requirements Planning under
Evaluations
.
Recommendation
SAP recommends defining a separate extraction mode for certain MRP elements in order to filter out specific stock information or due production orders.
You have created an MRP controller and assigned the latter to the materials for which you wish to extract planning data.
You have created a database table to which the extracted values are to be passed on.
You have implemented the EXTRACT_SR_LIST_INFOS method in the BAdI MD_SR_LIST_EXTRACT. Here you define the destination and the transfer of the extracted data depending on the extraction mode.
The report extracts the desired data according to the extraction mode you specified and stores this data in the database table you created.
Create a variant for the report using transaction MDEX.
Define the selection criteria for a certain group of materials. Enter an MRP controller for example.
Specify at least the following selection criteria:
Extraction mode
Server group
Specify a short text for the variant and choose Save.
Choose Schedule to specify the execution date.
Check the log and the results upon completion of the job.
To be able to check the extracted data, you must either write an ALV report or display the table with the extracted data in transaction SE16.