 Starting Scheduling Locate this document in the navigation structure

Use

You can start scheduling manually at any time.

If changes relevant to scheduling are made in the order it is given the status NTUP (dates are not updated). In this case, the order is automatically rescheduled when it is saved, if at least one of the following conditions are fulfilled:

  • The Automatic scheduling indicator is set automatically (Customizing for Shop Floor Control by choosing   Operations   Scheduling   Define Production Order Scheduling Parameters   ).

  • The order is released (REL status)

Procedure

  1. Call up a production order (only in create or change mode).

  2. Choose  ( ) .

The system schedules the production order and creates a scheduling log.