 Collective Availability Check: Results Locate this document in the navigation structure

The following data is generated as a result of a collective availability check with the standard profile.

  • Results key

This key informs you of the result of the overall availability check for the order (fully committed, not fully committed etc.).

  • Messages issued during the check

This key specifies the highest level of message issued during the availability check (information being the lowest, abend the highest message level).

  • Commitment ratio

Ratio between the committed order quantity and the order quantity.

  • Commitment difference

Difference (in workdays) between the planned basic finish date and the committed basic finish date (=overall commitment date) of the order.

  • Total committed date of the order (date on which the entire quantity can be delivered)

  • Committed quantity of the order

  • Missing parts status (for production orders with missing parts)