Show TOC

 Reassigning Document Links Locate this document in the navigation structure

Use

A document link can be assigned to an order header (no entries in the Sequence or Operation fields) or to an operation. You change this assignment using this procedure.

Procedure

  1. Choose   Logistics   Production   Shop floor control   Order   Change   .  

  2. Enter the order number.

  3. Choose  ( ) .

  4. The document overview appears.

  5. Select the document links that are to be reassigned.

  6. Choose  ( ) .

  7. You have the following options:

  • Select Header to assign the documents to the header.

  • Select Operation to assign the documents to an operation, and enter the operation and sequence numbers.

  1. Choose  ( ) .

  2. Choose  ( ) .