Show TOC

Background documentationWIP Change Locate this document in the navigation structure

 

You use the SU570 hook point activity to change the BOM and components associated with an SFC number (see Bill of Material (BOM), Component, and SFC Number). This activity allows you to move components from one SFC number to another.